Loading...
HomeMy WebLinkAbout17826 Graphite Lane-SurveyPlanning DepartmentApprovedDate:__________________04/22/2021 kjenson ENGINEERING REVIEWED Date:__________________04/13/2021 lvlasaty The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION