Loading...
HomeMy WebLinkAbout17730 Everest Ave SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________04/19/2021 lvlasaty Planning DepartmentApprovedDate:__________________04/28/2021 kjenson