HomeMy WebLinkAbout16169 Duvane Way Survey1. Bearings are based on the recorded plat.
2. Building dimensions shown are for horizontal and vertical placement of
structure only. See architectural plans for building and foundation
dimensions.
3. No specific soils investigation has been completed on this lot by James
R. Hill, Inc. the suitability of soils to support the specific house proposed
is not the responsibility of James R. Hill, Inc. or the surveyor.
4. No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part
of this survey. Only easements per the recorded plat are shown.
5. Proposed grades shown were taken from the grading &/or
development plan prepared by James R. Hill, Inc.
6. Grading plan date/revision date: 9/17/2020.
7. Plan No. SBF23.05.01-PLAN ONE-ELEVATION A
Proposed
Garage Floor @ Front = 935.7
Garage Top of Block = 936.4
House Top of Block = 936.4
Lowest Floor = 928.4
Top of Block
at Egress Window = 931.6
16169 Duvane Way, Lakeville, Minnesota
Top nut of hydrant located 50 ft.± East of Lot 9, Block 1 = 939.92
Denotes set spike
Denotes set iron monument
Denotes found iron monument
Denotes proposed drainage
Denotes top of curb
Denotes existing elevation
Denotes proposed elevation PHONE: 952.890.6044 www.jrhinc.comPLANNERS / ENGINEERS / SURVEYORSCERTIFICATE OF SURVEYFORDRAWN BY
DATE
REVISIONS
CAD FILE
PROJECT NO.
SHEET 1 OF 1
Lot = 2,485 sq. ft.
House/Garage = 1,375 sq. ft.
Porch = 24 sq. ft.
Driveway = 60 sq. ft.
Patio = 60 sq. ft.
Total Impervious = 1,519 sq. ft. or
61.1 % of lot
2999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Lot 5, Block 1, SPIRIT OF BRANDTJEN FARM 23RD ADDITION, Dakota County,
Minnesota
JCB Lot 5, Block 1, SPIRIT OF BRANDTJEN FARM23RD ADDITION, Dakota County, Minnesota410206.dwg
410206
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 16th day of February, 2021
Marcus F. Hampton, MN L.S. No. 47481
2/16/2021
Planning DepartmentApprovedDate:__________________03/12/2021 dmorey
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________03/17/2021 lvlasaty