Loading...
HomeMy WebLinkAbout9895 189th Street SurveyZoning = RS-3The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. *Draintile connection required. ENGINEERING REVIEWED Date:__________________05/13/2021 lvlasaty 2226 is present 5-14-21 confirmed by MRP There are also several aspen in front of the oak that are not denoted on plans that should probably be removed after home is built due to their root zone's close proximity to house pad and likelihood of decline due to root severance -ERB