HomeMy WebLinkAbout9895 189th Street SurveyZoning = RS-3The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.
*No structures in easements.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________05/13/2021 lvlasaty
2226 is present 5-14-21
confirmed by MRP
There are also several aspen in front of
the oak that are not denoted on plans
that should probably be removed after
home is built due to their root zone's
close proximity to house pad and
likelihood of decline due to root
severance -ERB