Loading...
HomeMy WebLinkAbout21-060CITY OF LAKEVILLE RESOLUTION NO. 21-60 Resolution Authorizing WSB & Associates to Prepare a Feasibility Report for the 2022 Street Reconstruction Project WHEREAS, the 2022 Street Reconstruction Project, City Project 22-02, is programmed in the City's adopted 5 -year Capital Improvement Plan (2021-2025); and WHEREAS, the City of Lakeville wishes to finance a portion of the project through special assessments; and WHEREAS, an engineering feasibility report is required under Minnesota Statutes, Chapter 429 for this proposed local improvement. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, that the City Engineer is hereby authorized to prepare an engineering feasibility report for the 2022 Street Reconstruction Project, City Project 22-02, advising the City Council in a preliminary way as to whether the proposed improvement is necessary, cost effective, and feasible; whether it should be best made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for the affected parcel(s). ADOPTED by the Lakeville City Council this 17th day of May 2021 CITY OF LAKEVILLE Douglas P. Anderson, Mayor \ AT EST: 2��— Charlene Friedges, City erk