HomeMy WebLinkAbout21-060CITY OF LAKEVILLE
RESOLUTION NO. 21-60
Resolution Authorizing WSB & Associates to Prepare a Feasibility Report for the 2022 Street
Reconstruction Project
WHEREAS, the 2022 Street Reconstruction Project, City Project 22-02, is programmed in the
City's adopted 5 -year Capital Improvement Plan (2021-2025); and
WHEREAS, the City of Lakeville wishes to finance a portion of the project through special
assessments; and
WHEREAS, an engineering feasibility report is required under Minnesota Statutes, Chapter 429
for this proposed local improvement.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lakeville, that the
City Engineer is hereby authorized to prepare an engineering feasibility report for the 2022 Street
Reconstruction Project, City Project 22-02, advising the City Council in a preliminary way as to
whether the proposed improvement is necessary, cost effective, and feasible; whether it should be
best made as proposed or in connection with some other improvement; the estimated cost of the
improvement as recommended; and a description of the methodology used to calculate
individual assessments for the affected parcel(s).
ADOPTED by the Lakeville City Council this 17th day of May 2021
CITY OF LAKEVILLE
Douglas P. Anderson, Mayor \
AT EST:
2��—
Charlene Friedges, City erk