Loading...
HomeMy WebLinkAbout19762 Henning Ave SurveyZoning = RS-3 *Draintile connection required. Add benchmark info. with the as-built. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________05/12/2021 jpesik EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.