HomeMy WebLinkAbout19762 Henning Ave SurveyZoning = RS-3
*Draintile connection required.
Add benchmark info. with
the as-built.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________05/12/2021 jpesik
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.