HomeMy WebLinkAbout7781 206th St WCITY OF LAKEVILLE
CERTIFICATION OF GRADING AND
FINAL PLACEMENT OF IRON MONUMENTS
Building Permit #: 180445
Legal Description: Lot 19 Block 2
Subdivision: Cedar Crossings
Address: 7781 206th Street West
RECEIVED
By Joey Pesik at 1:44 pm, May 17, 2021
I hereby certify that on the 15th day of October . 2020 an inspection of this property
was conducted by me or under my direct supervision and that the as -built grades,
elevations and drainage patterns of the site and building are in conformance with the
grading plan approved by the City Engineer or amendments previously approved by the
City Engineer. In addition, all property corner monuments are in place as of this date.
I hereby certify that this survey plan or report was prepared by me or under my direct
supervision and that I am a duly Licensed Land Surveyor under the laws of the State of
Minnesota.
(1
Signature: • . —
Print Name: Marcus F. Hamnton
Date: 10/20/2020 MN License #: 47481
NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS -
BUILT GRADES. ELEVATIONS AND DRAINAGE PATTERNS
Approved subdivision grading plans should be obtained from the property owner or
developer. General questions relating to the building permit should be directed to the
Building Inspections Department at 952-985-4440. Questions relating to grading should
be directed to the Engineering Department at 952-985-4500.
Prior to release of the Grading Security, this document shall be filed with:
City of Lakeville
Engineering Department
20195 Holyoke Avenue
Lakeville, MN 55044
11x17
LIJ
/ n
..
C�
- 7
L _
L IJ
- 7
L -
SCALE IN FEET
9 30'
nT
L _\-% I
nT 0
L_U
O
N83°59'10"E 194.50 [991.1] [991.993.0]992.01
992.41 [992.8]`
4] 991.81 993.0)
HP
091.5)
9925,
T
_ f `992 O
O
DRAINAGE & UTILITY `99�5, 03
•
""EASEMENT PER PLAT `.99`L'
\<%
60'
O
•
a
tc
x[9oo.o]
(930.0)
49.J)N
Denotes set spike
Denotes set iron monument
Denotes found iron monument
Denotes found scribed "x"
Denotes set hub
Denotes proposed drainage
Denotes top of curb
Denotes As -built elevation
Denotes proposed elevation
N
SQ90
`9911, LOT 1 g`99� 1,
c,
5
`99�•1
N
4,
\°?
4
� �9J
cb
C cb
V I
+ O\
- 0 \
15
CVO)
w
}
1 "rd z o
rn
'- 1
3.0 (SEwo)
9g2l,�c [992.6]tc
�A 7' 27 „
CATCH BASIN
TOP OF RIM
•� ELEV.=[988.6]
(988.6)
RE
r-
2d6TH
sTREET
vyEST
PROPERTY DESCRIPTION
Lot 19, Block 2, CEDAR CROSSINGS, Dakota County, Minnesota
PROPERTY ADDRESS
7781 206th Street West, Lakeville, Minnesota
NOTES
1. Bearings are based on the recorded plat.
2. Building dimensions shown are for horizontal and vertical placement of
structure only. See architectural plans for building and foundation
dimensions.
3. No specific soils investigation has been completed on this lot by James
R. Hill, Inc. the suitability of soils to support the specific house proposed
is not the responsibility ofJames R. Hill, Inc. or the surveyor.
4. No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part
of this survey. Only easements per the recorded plat are shown.
5. Proposed grades shown were taken from the grading &/or
development plan prepared by James R. Hill, Inc.
6. Grading plan date/revision date: July 13, 2018
7. Plan No. 3402-A 'CLAYTON'
BENCHMARK
Top nut of hydrant located at Lots 20 and 21, Block 2 = 996.08
FLOOR ELEVATIONS
Garage Floor @ Front
Garage Top of Foundation
House Top of Foundation
Lowest Floor
Proposed Asbuilt
= 995.2 = 995.2
= 995.6 = 995.6
= 995.6 = 995.6
= 995.6 = 995.3
HARD COVER CALCULATIONS
Lot
House/Garage
Porch
Driveway
Sidewalk
Patio
Total Impervious
= 17,013 sq. ft.
= 2,538 sq. ft.
= 30 sq. ft.
= 716 sq. ft.
= 37 sq. ft.
= 165 sq. ft.
= 3,486 sq. ft. or 20.49% of lot
DRIVEWAY TOTAL - 1,045 S F.
SURVEYOR'S CERTIFICATE
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 30th day of April, 2020
Ma us F. enitnaldtrZil
v
a)
E
co
G)
CC
>-
w
▪ CC
OD
OD
CC
w
w
Cry
w
OD
CC
w
0_
O
eg
DRAWN BY
SHP/NDG
DATE
4/30/2020
REVISIONS
A 6/11/20 Re -stake
R 10/15/2I1 Final r a^'a AS n aq
CAD FILE
400395 dwg
PROJECT NO.
400395
SHEET 1 OF 1