HomeMy WebLinkAbout16440 Dunfield DrCITY OF LAKEVILLE
CERTIFICATION OF GRADING AND
FINAL PLACEMENT OF IRON MONUMENTS
Building Permit #: 179101
Legal Description: Lot 11 Block 10
RECEIVED
L By Christina Orlowsky at 7:48 am, Oct 26, 2020
Subdivision: Spirit of Brandtien Farm l 8th Addition
Address: 16440 Duffield Drive
I hereby certify that on the 15th day of October . 2020 an inspection of this property
was conducted by me or under my direct supervision and that the as -built grades,
elevations and drainage patterns of the site and building are in conformance with the
grading plan approved by the City Engineer or amendments previously approved by the
City Engineer. In addition, all property corner monuments are in place as of this date.
I hereby certify that this survey plan or report was prepared by me or under my direct
supervision and that I am a duly Licensed Land Surveyor under the laws of the State of
Minnesota.
i1
Signature: •
Print Name: Marcus F. Hamnton
Date: 10/19/2020 MN License #: 47481
NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS -
BUILT GRADES. ELEVATIONS AND DRAINAGE PATTERNS
Approved subdivision grading plans should be obtained from the property owner or
developer. General questions relating to the building permit should be directed to the
Building Inspections Department at 952-985-4440. Questions relating to grading should
be directed to the Engineering Department at 952-985-4500.
Prior to release of the Grading Security, this document shall be filed with:
City of Lakeville
Engineering Department
20195 Holyoke Avenue
Lakeville, MN 55044
/
11x17
3r
'6'
5
SCALE IN FEET
9 20'
40'
v
ON OP
L9
J
S
J
4-
O
�
tc
X900.0
(930.0)
x[900.0]
/
/ 3
Denotes set spike
Denotes set iron monument
Denotes found iron monument
Denotes proposed drainage
Denotes top of curb
Denotes existing elevation
Denotes proposed elevation
Denotes as -built elevation
s
.0
PROPERTY DESCRIPTION
Lot 11, Block 10, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota
County, Minnesota
PROPERTY ADDRESS
16440 Dunfield Drive, Lakeville, Minnesota
NOTES
1. Bearings are based on the recorded plat.
2. Building dimensions shown are for horizontal and vertical placement of
structure only. See architectural plans for building and foundation
dimensions.
3. No specific soils investigation has been completed on this lot by James
R. Hill, Inc. the suitability of soils to support the specific house proposed
is not the responsibility ofJames R. Hill, Inc. or the surveyor.
4. No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part
of this survey. Only easements per the recorded plat are shown.
5. Proposed grades shown were taken from the grading &/or
development plan prepared by James R. Hill, Inc.
6. Grading plan date/revision date: 7/28/17
7. Plan No. SBF18.11.10-THE WOODBRIDGE-ELEVATION C
BENCHMARK
Top nut of hydrant located at Lots 11 and 12, Block 10 = 936.80
FLOOR ELEVATIONS
Garage Floor @ Front
Garage Top of Block
House Top of Block
Lowest Floor
Proposed Asbuilt
= 936.0 = 936.3
= 936.7 = 936.7
= 936.7 = 936.7
= 928.7 = 928.6
HARD COVER CALCULATIONS
Lot
House/Garage
Porch
Driveway
Patio
Total Impervious
= 11,809 sq. ft.
= 1,864 sq. ft.
= 132 sq. ft.
= 781 sq. ft.
= 168 sq. ft.
= 2,945 sq. ft. or
24.9 % of lot
SETBACKS
Front (Garage)
(House)
Side (House)
(Garage)
(Street)
Rear
= 25'
= 20'
= 7'
= 7'
= 15'
= 20'
SURVEYOR'S CERTIFICATE
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 7th day of April, 2020
aFf mpton, MN L.3. Nt T4-8
v
OD
CC
>—
w
CC
OD
OD
CC
w
w
w
OD
CC
w
0
ad.
co)
a)
E
w
D
I
LU
DRAWN BY
JCB/NDG
DATE
4/7/2020
REVISIONS
A Mil 5/2n Final G•AriP Mho tilt
CAD FILE
400337 dwg
PROJECT NO.
400337
SHEET 1 OF 1