Loading...
HomeMy WebLinkAbout16368 Dunfieldf DrCITY OF LAKEVILLE CERTIFICATION OF GRADING AND FINAL PLACEMENT OF IRON MONUMENTS Building Permit # 177683 Legal Description Lot 5 Block 10 I RECEIVED [By Christina Orlowsky at 3:35 pm, Oct 01, 2020 Subdivision SPIRIT OF BRANDTJEN FARM 18TH ADDITION Address 16368 Dunfield Dnve I hereby certify that on the 1 lth day of September, 2020 an inspection of this property was conducted by me or under my direct supervision and that the as -built grades, elevations and drainage patterns of the site and building are in conformance with the grading plan approved by the City Engineer or amendments previously approved by the City Engineer In addition, all property corner monuments are in place as of this date I hereby certify that this survey plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota - 1-k- - Signature `�' Print Name Marcus F Hampton Date 8/26/2020 MN License # 47481 NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS - BUILT GRADES. ELEVATIONS AND DRAINAGE PATTERNS Approved subdivision grading plans should be obtained from the property owner or developer General questions relating to the building permit should be directed to the Building Inspections Department at 952-985-4440 Questions relating to grading should be directed to the Engineenng Department at 952-985-4500 Prior to release of the Grading Security, this document shall be filed with: City of Lakeville Engineering Department 20195 Holyoke Avenue Lakevillie, MN 55044 11x17 3.53 R=1026.00— Z6 L=0°11'50"<<./ /J VO 4� mp SCALE IN FEET 2p' 40' ?J 4 • cb 1,b. O • tc X900.0 (930.0) X[900.0] Denotes set spike Denotes set iron monument Denotes found iron monument Denotes proposed drainage Denotes top of curb Denotes existing elevation Denotes proposed elevation Denotes as -built elevation of O\ PROPERTY DESCRIPTION Lot 5, Block 10, SPIRIT OF BRANDTJEN FARM 18TH ADDITION, Dakota County, Minnesota PROPERTY ADDRESS 16368 Dunfield Drive, Lakeville, Minnesota NOTES 1. Bearings are based on the recorded plat. 2. Building dimensions shown are for horizontal and vertical placement of structure only. See architectural plans for building and foundation dimensions. 3. No specific soils investigation has been completed on this lot by James R. Hill, Inc. the suitability of soils to support the specific house proposed is not the responsibility of James R. Hill, Inc. or the surveyor. 4. No specific title search for existence or non-existence of recorded or un-recorded easements has been conducted by the surveyor as a part of this survey. Only easements per the recorded plat are shown. 5. Proposed grades shown were taken from the grading &/or development plan prepared by James R. Hill, Inc. 6. Grading plan date/revision date: 7/28/17. 7. Plan No. SBF18.05.10-THE ABBOTT-ELEVATION A BENCHMARK Top nut of hydrant located at Lots 6 and 7, Block 10 = 938.96 FLOOR ELEVATIONS Garage Floor @ Front Garage Top of Block House Top of Block Lowest Floor Proposed Asbuilt = 938.1 = 938.4 = 938.8 = 938.8 = 938.8 = 938.8 = 930.8 = 930.6 HARD COVER CALCULATIONS Lot House/Garage Porch Driveway Total Impervious = 9,152 sq. ft. = 2,318 sq. ft. = 134 sq. ft. = 748 sq. ft. = 3,200 sq. ft. or 35.0 % of lot SETBACKS Front (Garage) (House) Side (House) (Garage) (Street) Rear = 25' = 20' = 7' = 7' = 15' = 20' SURVEYOR'S CERTIFICATE I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. That this survey does not purport to show all improvements, easements or encroachments, to the property except as shown thereon. Signed this 5th day of February, 2020 Maf u� (fiarhptbri, M—_ . 1 V CC w .\ CC CC w w c3 w C/D CC LLJ J 0 cid U) a) E E 0 0 CO Cr") CO N ILO O) a cd 0 0) 0 U co cO DRAWN BY JCB/NDG DATE 2/5/2020 REVISIONS A 0/11/20 Final F0rann Aahudi CAD FILE 400068.dwg PROJECT NO. 400068 SHEET 1 OF 1