Loading...
HomeMy WebLinkAbout19039 Iliad CirCITY OF LAKEVILLE CERTIFICATION OF GRADING AND FINAL PLACEMENT OF IRON MONUMENTS Building Permit #: 176703 Legal Description: Lot 3 Block 1 Subdivision: SUMMERLYN 8TH ADDITION Address: 19039 Iliad Circle. Lakeville. Minnesota RECEIVED By Christina Orlowsky at 8:41 am, Sep 17, 2020 We -F hereby certify that on 8th day of Sept. 2020 an inspection of this property was conducted by me or under my direct supervision and that the as -built grades, elevations and drainage patterns of the site and building are in conformance with the grading plan approved by the City Engineer or amendments previously approved by the City Engineer. In addition, all property corner monuments are in place as of this date. Exceptions noted. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Print Name: gP .ter J Hawkinson �i Signature: / i Date: Sept 10, 2020 MN License #: 42299 NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS - BUILT GRADES, ELEVATIONS AND DRAINAGE PATTERNS Approved subdivision grading plans should be obtained from the property owner or developer. General questions relating to the building permit should be directed to the Building Inspections Department at 952-985-4440. Questions relating to grading should be directed to the Engineering Department at 952-985-4500. Prior to release of the Grading Security, this document shall be filed with: City of Lakeville Engineering Department 20195 Holyoke Avenue Lakeville, MN 55044 ,e1 0 73 0 9 ccs 0' 10' 20' 111 Scale 1" = 20' Benchmark Top Nut Hydrant Lots 3-4 Block 1 Elevation = 1081.48 al' 00 Z 0 c N 0 0 0 01 h4 0 x� 190TH STREET W S89°49'30"E \\S PItNEERneenng, PA CIVn. ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS 2422 Enterprise Drive Mendota Heights, MN 55120 Ph.: (651) 681-1914 Fax: (651) 681-9488 www.pwneereng com Project # .119237002 'Folder #: 8258I Drawn by MTW © Pioneer Engineering O 0x \p0 OOryry .055 ° 0hh 0 X x o0ao°°0ao X x 30 X 95.90 BITUMINOUS 3\ Drainage and utility easement_per plat x r Ala') x10 10.(h \o x x hry 6 101 "1A X '� O^� x� Ah 1°a 10 •\o X 1 et X1 O h4) Lot 3, Block 1, SUMMERLYN 8TH ADDITION according to the recorded plat thereof Dakota County, Minnesota Address: 19039 Iliad Circle, Lakeville, Minnesota House Model: Independence N501 Elevation: A3 Buyer: Little 11x17 h a 0 0o x1 r) a0 ova x x1 77 / i Revisions 1 1 I I -05-19 Stake house Certificate of Survey for: Lennar Corporation 16305 36th Ave N Ste #600 Plymouth, MN 55446-4270 Phone: (952) 249-3000 / Fax: (952) 404-1909 aHEb1 1 ill- oHEE1 Lowest opening elevation per grading plan 1076.0 Lowest floor elevation per grading plan 1072.5 House elevations Lowest Footing Elevation Top 0f Foundation Elev Garage Lip Elev. CO Door T.O.F. Elevation (Pr000sed) / As —built :(1072.8) / 1072.6 FTG :(1080.8) / 1081.0 :(1080.5) / 1080.1 UP ® Lookout:(1076.0) / 1076.1 • Denotes iron pipe 460 Denotes service n Denotes television box 111 Denotes electric box ▪ Denotes telephone box X 000 00 Denotes existing elevation ( 000.00 ) Denotes proposed elevation Denotes drainage flow direction • Denotes spike Lot area =24704 SF House area =2339 SF Porch area =89 SF Driveway area =934 SF Total Impervious Area =3362 SF Impervious Coverage =13.6% r`, 0f, k linn IMPS' 1. Install roc construction entrance 2. Install silt fence as needed for erosion control. 3. Sidewalks shall drain away from house a minimum of 1 0% 4. Contractor must verify driveway design. 5. Contractor must verify service elevation prior to construction 6. Add or remove foundation ledge as required. General Notes: 1. Grading plan by Pioneer Engineering last dated 8/1/19 was used to determine proposed elevations shown herein. 2. This survey does not purport to show improvements or encroachments, except as shown, as surveyed by me or under my direct supervision. 3. Proposed building dimensions shown are for horizontal location of structures on the lot only. Contact builder prior to construction for approved construction plans. 4. No specific soils investigation has been performed on this lot by the surveyor. The suitability of soils to support the specific house proposed is not the responsibility of the surveyor. 5. This certificate does not purport to show easements other than those shown on the recorded plat. 6. Bearings shown are based on an assumed datum. PItNEERneenng, P.A, CIVn. ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS 2422 Enterprise Drive Ph. : (651) 681-1914 Mendota Heights, MN 55120 Fax: (651) 681-9488 www.pwneereng com Project # .119237002 (Folder #:8258I Drawn by MTW $ © Pioneer Engineering Detail a / I �0 not to scale Detail b not to scale Detail c • co O) —1- not to scale We hereby certify to Lennar Corporation that this survey, plan or report was prepared by me or under my direct supervision, and that I am a duly licensed Land Surveyor under the laws of the State of Minnesota, dated 11/04/19. BY: Signed: ioeer Engineering, P.A. Peter J. HawKff�56n, essi0 al Land Surveyor Minnesota License No. 42299 email—phawkinson©pioneereng com Lot 3, Block 1, SUMMERLYN 8TH ADDITION according to the recorded plat thereof Dakota County, Minnesota Address: 19039 Iliad Circle, Lakeville, Minnesota House Model: Independence N501 Elevation: A3 Buyer: Little Revisions 1 1 I I -05-19 Stake house Certificate of Survey for: Lennar Corporation 16305 36th Ave N Ste #600 Plymouth, MN 55446-4270 Phone: (952) 249-3000 / Fax: (952) 404-1909 � >r JHEE1 :OF :6Hhb1J