HomeMy WebLinkAbout18078 Greyhaven Path SurveyBLOCK 2
LOT 1
PORCH
PROPOSED
HOUSE
GARAGE
DRIVEWAY
20.001.0010.007.6314.8843.7544.75
29.880.13
22.500.13
15.006.13HARLOW PATHHAMBURG AVENUE
DRAINAGE & UTILITY
EASEMENT
15.20
CENTERLINE
6
:6
:L =7 4 .0 66666666666666666666666666666666666666666R=2 7 2 .0 00000000000000000000000000000000000000000L=129.244444444444444444444444444444444444444444R=940.000000000000000000000000000000000000000000=752'40"""""""""""""""""""""""""""""""""""""""""=1 5 3 6 '0 2 "
10 10105
5
10
1010252542.6128.45
15.08
25.3021.00
20.00
40.00CENTERLINE
LOT 1
27.6752.79STOCK
PILE
24.0
20.0
SERV
FENCE LINEELECTRANS6' TELEPHONE LINE
EASEMENT SHOWN
PER PLAT6 640
40
THE BEARINGS SHOWN HEREON ARE BASED ON
THE RECORDED PLAT OF AVONLEA 4TH ADDITION.
1112 HIGHWAY 55, SUITE 201, HASTINGS, MN 55033
(651)438-0000
PROPERTY DESCRIPTION
Lot 1, Block 2, AVONLEA 4TH ADDITION,
Dakota County, Minnesota.
DENOTES FOUND IRON MONUMENT.
SURVEYOR LICENSE NO. 48634.
HAVING A PLASTIC CAP BEARING LAND
DENOTES A PLACED 1" BY 18" IRON PIPE
DENOTES SET OFFSET STAKE.
DENOTES EXISTING SPOT ELEVATION.
DENOTES PROPOSED SPOT ELEVATION.
DENOTES PROPOSED DRAINAGE ARROW.
NOTES:
ā DRIVEWAY GRADE = 9.6%
ā BENCHMARK IS TOP OF SOUTHWEST HOUSE OFFSET HUB.
ELEVATION = 996.17
ā INSTALL ROCK CONSTRUCTION ENTRANCE.
ā INSTALL SILT FENCE AS NEEDED FOR EROSION CONTROL
ā BUILDING DIMENSIONS SHOWN ARE TO OUTSIDE OF THE
BASEMENT FOUNDATION PLAN. ALL DIMENSIONS AND
LOCATIONS ARE TO BE VERIFIED IN THE FIELD WITH THE
ARCHITECTURAL PLANS.
ā GRADING PLAN 02-28-2019.
AREAS:
ā LOT = 13747 SQ. FT.
ā BUILDING FOOTPRINT = 2300 SQ. FT.
ā DRIVEWAY = 886 SQ. FT.
CERTIFICATE OF SURVEY
FOR: LENNAR HOMES
18078 GREYHAVEN PATH, LAKEVILLE
MODEL: COURTLAND ELEVATION: A3
Planning DepartmentApprovedDate:__________________05/07/2021 dmorey
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWED
Date:__________________05/12/2021 jpesik
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.