HomeMy WebLinkAboutLA190629 - 17964 Evening Lane Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
20195 Holyoke Avenue, Lakeville, MN 55044
952-985-4400 952-985-4499 fax
www.lakevillemn.gov
Sewer & Water Tie Card
Address:________________________________________
Contractor:______________________________________
Permit Number:__________________________________
Final Date:________________
Street Drain-Tile:______
Size of Water Service: 1”
Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS
THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME
OF SEWER & WATER INSPECTION
Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode05/10/2021dmathews
Secure door closed until deck isconstructed with a separate permit.
UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.3
BWPsAbove335193310376PFHHold-DownPFHPFH
-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).2222222222222222
10'BWL 14'3'
50'33'16'BWL 2BWL 3BWL 4BWL 5BWL 64'4'6'3'3'3'3'5'19'7'3'10'SEE DETAIL 1/PF1SEE DETAIL 2/PF1
30'38'BWL 7BWL 8BWL 9BWL 102'2'2'2'2'2'2'2'2'2'2'2'2'2'2'2'
Voigt & Associates, Inc.C-1Structural Engineering Services 4635 Nicols Road, Suite 204Eagan, MN 55122MethodCS-WSPWind speed 115Exposure C BWL 1 2 3 4 5 6 7 8 9 10Spacing - ft 10 33 33 16 50 50 38 38 30 30Level 3 2 2 2 2 2 1 1 1 1Length req'd- ft 5 9.8 9.8 5.3 14 14 5.7 5.7 4.5 4.5per Table R602.10.3(1)Adjustments:Exposure 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4Eave to ridge Height 1 1 1 1 1 1 1 1 1 1Wall Height 0.9 0.95 0.95 0.95 0.95 0.95 0.9 0.9 0.9 0.9# of BWL 1 1.3 1.3 1.3 1 1 1 1 1 14" Gyp WB w.block joints1 0.7 1 1 1 1 1 1 1 1Adjusted Length 6.3 11.9 16.9 9.2 18.6 18.6 7.2 7.2 5.7 5.7Knob Hill Model #217964 Evening Lane, Lakeville, MN Sheet
Stone Cottage
HVAC Load Calculations
for
Stone Cottage
17964 Evening Ln
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Friday, April 16, 2021
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Friday, April 16, 2021
Client Name:Stone Cottage
Client Address:17964 Evening Ln
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces South
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,126 CFM Per Square ft.:0.342
Square ft. of Room Area:3,292 Square ft. Per Ton:1,211
Volume (ft³) of Cond. Space:29,628
Building Loads
Total Heating Required Including Ventilation Air:50,294 Btuh 50.294 MBH
Total Sensible Gain:24,474 Btuh 79 %
Total Latent Gain:6,579 Btuh 21 %
Total Cooling Required Including Ventilation Air:31,053 Btuh 2.59 Tons (Based On Sensible + Latent)
2.72 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.59 1,272 3,292 24,474 6,579 31,053 50,294 925 1,126 1,126
System 1 Yes 2.59 1,272 3,292 24,474 6,579 31,053 50,294 925 1,126 1,126 21x10
Ventilation 437 1,352 1,789 5,850
Zone 1 3,292 24,037 5,227 29,264 44,444 925 1,126 1,126 21x10
1-Main Level 1,064 10,080 1,812 11,892 16,854 351 472 472 6--6
2-Upper Level 1,164 11,703 2,424 14,127 17,687 368 548 548 6--6
3-Lower Level 1,064 2,254 991 3,245 9,903 206 106 106 1--6
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
489 13,614 0 10,910 10,910
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2223 12,571 0 1,922 1,922
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
954 4,067 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1164 2,025 0 1,117 1,117
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1064 2,314 0 0 0
Subtotals for structure:35,869 0 14,301 14,301
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 92, Summer CFM: 48 8,575 927 666 1,593
Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789
Total Building Load Totals:50,294 6,579 24,474 31,053
Check Figures
Total Building Supply CFM:1,126 CFM Per Square ft.:0.342
Square ft. of Room Area:3,292 Square ft. Per Ton:1,211
Volume (ft³) of Cond. Space:29,628
Building Loads
Total Heating Required Including Ventilation Air:50,294 Btuh 50.294 MBH
Total Sensible Gain:24,474 Btuh 79 %
Total Latent Gain:6,579 Btuh 21 %
Total Cooling Required Including Ventilation Air:31,053 Btuh 2.59 Tons (Based On Sensible + Latent)
2.72 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Building Pie Chart
Building
Loss
50,294
Btuh
Floor 5%Roof 4%
Wall 33%
Glass 27%
Door 3%
Infiltration 17%
Ventilation 12%
Building
Gain
31,053
Btuh
Roof 4%Wall 6%
Glass 35%
Door 1%People 12%
Equipment 31%
Infiltration 5%
Ventilation 6%
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
489 13,614 0 10,910 10,910
11N: Door-Metal - Polystyrene Core 42 1,278 0 352 352
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2223 12,571 0 1,922 1,922
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
954 4,067 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1164 2,025 0 1,117 1,117
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
1064 2,314 0 0 0
Subtotals for structure:35,869 0 14,301 14,301
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 92, Summer CFM: 48 8,575 927 666 1,593
Ventilation: Winter CFM: 140, Summer CFM: 70 5,850 1,352 437 1,789
System 1 Whole House Load Totals:50,294 6,579 24,474 31,053
Check Figures
Supply CFM:1,126 CFM Per Square ft.:0.342
Square ft. of Room Area:3,292 Square ft. Per Ton:1,211
Volume (ft³) of Cond. Space:29,628
System Loads
Total Heating Required Including Ventilation Air:50,294 Btuh 50.294 MBH
Total Sensible Gain:24,474 Btuh 79 %
Total Latent Gain:6,579 Btuh 21 %
Total Cooling Required Including Ventilation Air:31,053 Btuh 2.59 Tons (Based On Sensible + Latent)
2.72 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,064.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,064.0 sq.ft.Supply Air:472 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.0 AC/hr
Volume:9,576.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:6 Actual Winter Vent.:53 CFM
Runout Air:79 CFM Percent of Supply.:11 %
Runout Duct Size:6 in.Actual Summer Vent.:29 CFM
Runout Air Velocity:401 ft./min.Percent of Supply:6 %
Runout Air Velocity:401 ft./min.Actual Winter Infil.:41 CFM
Actual Loss:0.101 in.wg./100 ft.Actual Summer Infil.:21 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
S -Wall-12F-0sw 30 X 9 224 0.065 5.7 1,267 0.9 0 194
N -Wall-12F-0sw 30 X 9 141 0.065 5.7 797 0.9 0 122
E -Wall-12F-0sw 38 X 9 302 0.065 5.7 1,708 0.9 0 261
W -Wall-12F-0sw 38 X 9 286 0.065 5.7 1,617 0.9 0 247
N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
S -Gls-4A-1a-o shgc-0.33 0%S 46 0.320 27.8 1,281 19.2 0 882
N -Gls-4A-1a-o shgc-0.33 100%S 87 0.320 27.8 2,422 10.4 0 906
E -Gls-4A-1a-o shgc-0.33 0%S 40 0.320 27.8 1,114 35.0 0 1,400
W -Gls-4A-1a-o shgc-0.33 0%S 56 0.320 27.8 1,559 35.0 0 1,960
Subtotals for Structure:13,043 0 6,324
Infil.: Win.: 41.0, Sum.: 21.3 1,224 3.114 3,811 0.242 412 296
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 3,000
Room Totals:16,854 1,812 10,080
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,164.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,164.0 sq.ft.Supply Air:548 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.1 AC/hr
Volume:10,476.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:6 Actual Winter Vent.:56 CFM
Runout Air:91 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:34 CFM
Runout Air Velocity:465 ft./min.Percent of Supply:6 %
Runout Air Velocity:465 ft./min.Actual Winter Infil.:42 CFM
Actual Loss:0.135 in.wg./100 ft.Actual Summer Infil.:22 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
S -Wall-12F-0sw 30 X 9 216 0.065 5.7 1,221 0.9 0 187
N -Wall-12F-0sw 30 X 9 221 0.065 5.7 1,250 0.9 0 191
E -Wall-12F-0sw 40 X 9 305 0.065 5.7 1,725 0.9 0 264
W -Wall-12F-0sw 40 X 9 310 0.065 5.7 1,753 0.9 0 268
S -Gls-4A-1a-o shgc-0.33 0%S 54 0.320 27.8 1,503 19.2 0 1,036
N -Gls-4A-1a-o shgc-0.33 100%S 49 0.320 27.8 1,364 10.4 0 510
E -Gls-4A-1a-o shgc-0.33 0%S 55 0.320 27.8 1,531 35.0 0 1,925
W -Gls-4A-1a-o shgc-0.33 0%S 50 0.320 27.8 1,392 35.0 0 1,750
UP-Ceil-16B-50 1164 X 1 1164 0.020 1.7 2,025 1.0 0 1,117
Subtotals for Structure:13,764 0 7,248
Infil.: Win.: 42.3, Sum.: 22.0 1,260 3.113 3,923 0.242 424 305
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:17,687 2,424 11,703
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,064.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,064.0 sq.ft.Supply Air:106 CFM
Ceiling Height:9.0 ft.Supply Air Changes:0.7 AC/hr
Volume:9,576.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:1 Actual Winter Vent.:31 CFM
Runout Air:106 CFM Percent of Supply.:30 %
Runout Duct Size:6 in.Actual Summer Vent.:7 CFM
Runout Air Velocity:538 ft./min.Percent of Supply:6 %
Runout Air Velocity:538 ft./min.Actual Winter Infil.:9 CFM
Actual Loss:0.180 in.wg./100 ft.Actual Summer Infil.:5 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 30 X 9 218 0.065 5.7 1,233 0.9 0 188
S -Wall-15B0-10sf-10 30 X 9 270 0.049 4.3 1,151 0.0 0 0
E -Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0
W -Wall-15B0-10sf-10 38 X 9 342 0.049 4.3 1,458 0.0 0 0
N -Gls-4A-1a-o shgc-0.33 100%S 52 0.320 27.8 1,448 10.4 0 541
Floor-21A-24 1 X 1064 1064 0.025 2.2 2,314 0.0 0 0
Subtotals for Structure:9,062 0 729
Infil.: Win.: 9.1, Sum.: 4.7 270 3.115 841 0.241 91 65
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:9,903 991 2,254
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,064 16,854 351 6-6 401 10,080 1,812 472 472
2 Upper Level 1,164 17,687 368 6-6 465 11,703 2,424 548 548
3 Lower Level 1,064 9,903 206 1-6 538 2,254 991 106 106
Ventilation 5,850 437 1,352
System 1 total 3,292 50,294 925 24,474 6,579 1,126 1,126
System 1 Main Trunk Size:21x10 in.
Velocity:772 ft./min
Loss per 100 ft.:0.088 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.59 79% / 21%24,474 6,579 31,053
Recommended:2.72 75% / 25%24,474 8,158 32,632
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\17964 EVENING LAKEVILLE 04162021.rhv Friday, April 16, 2021, 9:19 AM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer
or other system monitoring
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
24,474Residential Load Calculation
SEER
/EER
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox Fiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness:
Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not ApplicableAttic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
50,294
Heating Gain Cooling Load
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville17964 Evening Lane
BC636874
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
31,053
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
X04/30/21
KP