HomeMy WebLinkAbout17964 Evening Lane SurveyZoning = RS-4The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.ENGINEERING REVIEWEDDate:__________________05/12/2021jpesikEROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.