Loading...
HomeMy WebLinkAbout19914 Harrisburg Way SurveyENGINEERING REVIEWED Date:__________________06/01/2021 jpesik The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION Zoning = RS-3