HomeMy WebLinkAbout19914 Harrisburg Way SurveyENGINEERING REVIEWED
Date:__________________06/01/2021 jpesik
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
Zoning = RS-3