Loading...
HomeMy WebLinkAbout17963 Hawksbill Drive Survey*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.Zoning = RS-4ENGINEERING REVIEWEDDate:__________________06/07/2021jpesikEROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.Make sure to keep cross-propertyflow within the easement. Bemindful of this when looking at lot 2.