HomeMy WebLinkAbout9878 189th Street West-Survey*Draintile connection required.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________06/07/2021 jpesik
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
Zoning = RS-3