Loading...
HomeMy WebLinkAboutLA192863 - Approved Doreen Ehler Engineering 06-30-21_AIy7cCHHv Wyssling Consulting 76 North Meadowbrook Drive Alpine, UT 84004 Scott E. Wyssling, PE, PP, CME office (201) 874-3483 swyssling@wysslingconsulting.com June 30, 2021 Everlight Solar Construction PO Box 930550 Verona, WI 53593 Re: Engineering Services Ehler Residence 16484 Draft Horse Boulevard, Lakeville, MN 5.760 kW System To Whom It May Concern: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by an Everlight Solar representative identifying specific site information including size and spacing of trusses for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by Everlight Solar and will be utilized for approval and construction of the proposed system. 3. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of truss system with all chords constructed of 2 x 4 dimensional lumber at 24” on center. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof trusses. All wood material utilized for the roof system is assumed to be Doug-Fir #2 or better with standard construction components. The existing roofing material consists of composite asphalt shingles. Photos of the dwelling also indicate that there is a permanent foundation. A. Loading Criteria Used  115 MPH wind loading based on ASCE 7-16 Exposure Category “C” at a slope of 35 degrees  7 PSF = Dead Load roofing/framing Live Load = 20 PSF Snow Load = 50 PSF  3 PSF = Dead Load solar panels/mounting hardware Total Dead Load =10 PSF The above values are within acceptable limits of recognized industry standards for similar structures in accordance with the Minnesota Residential Code (2018 IRC). Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing trusses will support the additional panel loading without damage, if installed correctly. Page 2 of 2 B. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent “Quickbolt Installation Instruction”, which can be found on the Quickbolt website (http://quickbolt.com/). If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 lbs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Doug-Fir (North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 ½”, is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 ½” with a minimum size of 5/16” lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed no greater than 48” o/c. 4. Panel supports connections shall be staggered to distribute load to adjacent trusses. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is in conformance with the Minnesota Residential Code (2018 IRC), current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE Minnesota License No. 57927 Xcel Energy MN Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 PV01 COVER PAGE PV02 SITE PLAN PV03 ROOF PLAN PV04 ROOF ATTACHMENTS PV05 MOUNTING DETAIL PV06 LINE DIAGRAM PV07 LABELS PV08 PLACARD PV09 SITE PHOTOS PV10 TEST PROCEDURE COVER PAGE - PV01 DRAWN BY: SoloCAD 1.INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING. 2.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110. 3.ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250 4.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES. 5.ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] 6.DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] 7.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE. PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS AERIAL VIEW: SHEET INDEX: EQUIPMENT: AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) RACKING: IronRidge - 48" O.C. OCCUPANCY: R-3 ZONING: RESIDENTIAL 2020 NEC 2020 MRC 2020 MFC 2020 MBC STREET VIEW: GENERAL NOTES APPLICABLE GOVERNING CODES SITE SPECIFICATIONS ACPV MSP M C JB JB Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: EQUIPMENT LEGEND: INVERTERVISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL LC LOAD CENTER FIRE ACCESS PATHWAY (3' TYP) C INV PV AC MSP M COMBINER BOX PROPERTY LINE BATT BATTERY(IES) VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER SUB SUB PANEL ENGINEER STAMP (IF APPLICABLE) SITE PLAN - PV02 DRAWN BY: SoloCAD16484 Draft Horse BoulevardFRONT OF HOMEMP1 PITCH: 35° AZIMUTH: 126° CASE #: 04511091 NO CLEARANCE ISSUES AROUND HOME OR SOLAR ARRAY ELECTRIC SERVICE LINES ARE UNDERGROUND NOT OVERHEAD MAIN SERVICE PANEL LOCATED INSIDE 24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO XCEL ENERGY FOR ALL XCEL ENERGY OWNED METERS AND DISCONNECTS ALL PV EQUIPMENT INSTALLED WITHIN 10' OF UTILITY METER 183'-7" SOLAR ARRAY INVERTERS BEHIND PANELS 186'-2" 96'-1"49'165 th st W2'2'2' ACPV MSP M C JB JB Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: EQUIPMENT LEGEND: INVERTERUTILITY METER MAIN SERVICE PANEL LC LOAD CENTER FIRE ACCESS PATHWAY (3' TYP) C INV MSP M COMBINER BOX BATT BATTERY(IES) VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER SUB SUB PANELVISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER)PV AC ENGINEER STAMP (IF APPLICABLE) ROOF PLAN - PV03 DRAWN BY: SoloCAD 3' FIRE PATHWAY ACCESSFRONT OF HOMEMP1 PITCH: 35° AZIMUTH: 126° 18" TYP ROOF INFO: ROOF TYPE asphalt_shingle ROOF FRAMING manufactured_truss RAFTER/TOP CHORD SIZE 2x4 RAFTER/TOP CHORD SPACING 24" ATTACHMENT SPACING 48 JB JB EQUIPMENT INFORMATION: RAIL MANUFACTURER IronRidge RAIL PART NUMBER XR-10 ATTACHMENTS Quickbolt ATTACHMENT QTY 32 SPLICE QTY 4 MIDCLAMP QTY 24 ENDCLAMP QTY 16 ROOF INFO: Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: ENGINEER STAMP (IF APPLICABLE) PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: PV MODULE COUNT:16 ARRAY AREA:MODULE COUNT * 18.06ft² = 288.96 ROOF AREA:2623 ft² PERCENT OF ROOF COVERED:11% ARRAY WEIGHT:MODULE COUNT * 50lbs = 800 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 25 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.77 lbs/ft²ROOF ATTACHMENTS - PV04 DRAWN BY: SoloCAD RAIL L-FOOT/ATTACHMENT BRACKET (E) ROOF FRAMING 5/16" STAINLESS STEEL LAG-BOLT WITH 2-1/2" MIN. EMBEDMENT AND FLAT WASHER FLASHING PV MODULE (E) COMP SHINGLE ROOF (1 LAYER) RAIL END CLAMP PV MODULE MID CLAMP PV MODULE 4" 2 12" MIN. DEPTH RAIL RAIL FLASHING & LAG-BOLT 2'-8" MIN - 3'-10" MAX 3 RAIL PV MODULE 48" MAX.1'-8" MAX. 21 FRONT VIEW 10" MIN - 1'-4" MAX 2'-8" MIN - 3'-10" MAX 10" MIN - 1'-4" MAX SIDE VIEW (E) RAFTER/TOP CHORDS (E) RAFTER/TOP CHORD DETAIL, MOUNTING AND FLASHING END CLAMP DETAILS MID CLAMP DETAILS 3 21 EQUIPMENT INFORMATION: RAIL MANUFACTURER IronRidge RAIL PART NUMBER XR-10 ATTACHMENTS Quickbolt ATTACHMENT QTY 32 SPLICE QTY 4 MIDCLAMP QTY 24 ENDCLAMP QTY 16 ROOF INFO: ROOF INFO: ROOF TYPE asphalt_shingle ROOF FRAMING manufactured_truss RAFTER/TOP CHORD SIZE 2x4 RAFTER/TOP CHORD SPACING 24" ATTACHMENT SPACING 48 Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: PV MODULE COUNT:16 ARRAY AREA:MODULE COUNT * 18.06ft² = 288.96 ROOF AREA:2623 ft² PERCENT OF ROOF COVERED:11% ARRAY WEIGHT:MODULE COUNT * 50lbs = 800 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 25 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.77 lbs/ft² ENGINEER STAMP (IF APPLICABLE) MOUNTING DETAIL - PV05 DRAWN BY: SoloCAD J-BOX STRING (1): 15.960000 A AC, 14 MODULES STRING (2): 2.280000 A AC, 2 MODULES N G 3 AC COMBINER BOX SOLAR LOADS ONLY UL 1741 COMPLIANT AC DC AC DC 1 INVERTERS AC DC AC DC 7 INVERTERS J-BOX (N) 100A (2) 20A-2P J-BOX1 2 1 2 4 (E) LOADS N G (E)GROUNDING ELECTRODE INTERCONNECTION NOTES 1. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 215.9] & [NEC 230.95] 2. SUPPLY SIDE INTERCONNECTION ACCORDING TO [NEC705.12(A)] WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH [NEC 240.21(B)] DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH. 3. FUSED AC DISCONNECT TO BE USED. (E) 120/240 VAC TO UTILITY GRID SUPPLY SIDE CONNECTION: NEC 230.46, NEC 230.79, NEC 705.12(A). K4977-INT MILBANK LUG KIT TO BE ADDED (E) 200A-2P (E) 200A MAIN SERVICE PANEL UTILITY PV PRODUCTION METER BASE 4 4 (N) 30A FUSES PV AC DISCONNECT 60A FUSED, AIC 10kA VISIBLE, LOCKABLE, LABELED, OPEN 240V, 2-POLE DATE: June 30, 2021 SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) Xcel Energy MN Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: GROUNDING & GENERAL NOTES: 1. PV INVERTER IS UNGROUNDED, TRANSFORMER-LESS TYPE. 2. DC GEC AND AC EGC TO REMAIN UNSPLICED, OR SPLICED TO EXISTING ELECTRODE 3. ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS FOUND TO BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL INSPECTION. 4. JUNCTION BOX QUANTITIES, AND PLACEMENT SUBJECT TO CHANGE IN THE FIELD - JUNCTION BOXES DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE TYPE TRANSITIONS. 5. AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER AC DISCONNECTING MEANS IS LOCATED WITHIN 10' OF SERVICE DISCONNECT. ENGINEER STAMP (IF APPLICABLE) LINE DIAGRAM - PV06 DRAWN BY: SoloCAD Conduit & Conductor Schedule TAG WIRE GAUGE DESCRIPTION QTY CONDUIT SIZE CONDUCTOR RATING # OF CONDUCTORS DERATE TEMP. DERATE CONDUCTOR RATING W/DERATES CONDUIT FILL 1 12-2 TC-ER, THWN-2, COPPER (L1, L2)(2)N/A - FREE AIR 25A N/A - FREE AIR 0.96 24A N/A - FREE AIR6 AWG BARE, COPPER (GROUND)(1) 2 10 AWG THWN-2, or THHN, or 10/2 NM-B COPPER - (L1, L2)(2)3/4" EMT 35A 1 0.96 33.6A 11.9%10 AWG THWN-2, or THHN, or 10/2 NM-B COPPER - (GROUND)(1) 3 10 AWG THHN/THWN-2, COPPER - (L1, L2)(4)3/4" EMT 35A 0.8 0.96 26.88A 19.8%10 AWG THHN/THWN-2 - (GROUND)(1) 4 6 AWG THWN-2 COPPER - (L1, L2, NEUTRAL)(3)3/4" EMT 65A 1 0.96 62.4A 35.5%8 AWG THWN-2 COPPER - (GROUND)(1) VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER EQUIPMENT SCHEDULE: TYPE:QTY:DESCRIPTION:RATING: MODULES:(16)SIL-360 NX mono PERC 360 W INVERTERS:(8)AP Systems YC600 548 W AC DISCONNECT(S):(1)PV AC DISCONNECT, 240V, 2-POLE 60A REFERENCE POINT OF APPLICABILITY ALL PV EQUIPMENT INSTALLED WITHIN 10' OF UTILITY METER LOAD SIDE UTILITY AC DISCONNECT 1-PH, 3-WIRE, 120/240V, 200A CUSTOMER OWNED NO LOADS OR STAGE SYSTEM ON DER SIDE OF PRODUCTION METER THE PV PRODUCTION METER SOCKET MUST HAVE LEVER BYPASS/BYPASS LINE SIDE 1-PH, 240V RATED SERVICE CASE #: 04511091 DESIGN SHALL MEET NEC REQUIREMENTS AP Systems YC600 (240V) SPECS MAXIMUM INPUT VOLTAGE: 55A MAXIMUM INPUT CURRENT: 12A X 2 NOMINAL OUTPUT VOLTAGE: 240V NOMINAL OUTPUT CURRENT: 2.28A 1-PHASE 60HZ UL 1741 LISTED Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: ENGINEER STAMP (IF APPLICABLE) LABELS - PV07 DRAWN BY: SoloCAD LABEL 12 PLACARD TO BE PLACED AT AC DISCONNECT PER XCEL ENERGY. UTILITY AC DISCONNECT LABEL 3 AT POINT OF INTERCONNECTION, MARKED AT AC DISCONNECTING MEANS. [NEC 690.54, NEC 690.13 (B)] LABEL 4 AT POINT OF INTERCONNECTION FOR EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUTS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FORM MULTIPLE SOURCES, EACH SERVICE EQUIPMENT AND ALL ELECTRIC POWER PRODUCTION SOURCE LOCATIONS. [NEC 705.12(B)(3)] LABEL 5 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(D)(2)(3)(b)] *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON PV5 OF 3 LINE DIAGRAM. PV5 LINE DIAGRAM TO REFLECT ACTUAL REPRESENTATION OF PROPOSED SCOPE OF WORK. JUNCTION BOX OR COMBINER BOX MAIN SERVICE PANEL AC DISCONNECT EXISTING SUB PANEL (IF WHERE POINT OF INTERCONNECTION IS MADE) PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS AC DC INVERTER (S) INTEGRATED DC DISCONNECT 2 3 47 3 9 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 6 10 1 1 1 1 4 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 4 6 3 LABELING DIAGRAM: 12 11 8OR LABEL 6 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(G)(3&4)] LABEL 10 (ONLY IF 3 OR MORE SUPPLY SOURCES TO A BUSBAR) SIGN LOCATED AT LOAD CENTER IF IT CONTAINS 3 OR MORE POWER SOURCES. [NEC 705.12(D)(2)(3)(C)] LABEL 9 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [NEC 690.56(C)(3)]. LABEL 7 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 8 FOR PV SYSTEMS THAT ONLY SHUT DOWN CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(B)] LABEL 11 PLACARD TO BE PLACED AT THE MAIN BILLING METER PER XCEL ENERGY. LABEL 1 FOR PV DISCONNECTING MEANS WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B), NEC 705.22] LABEL 2 AT EACH DC DISCONNECTING MEANS, INCLUDING THE DC DISCONNECT AT THE INVERTER. [NEC 690.53, NEC 690.13(B)] LABEL 13 SIGN LOCATED AT MAIN SERVICE DISCONNECTING MEANS IF ALL ELECTRICAL POWER SOURCE DISCONNECTING MEANS ARE GROUPED WITHIN 10' AND LINE OF SITE OF MAIN SERVICE DISCONNECT [NEC 690.56(B) & NEC 705.10]. LABEL 14 SIGN LOCATED AT AC COMBINER BOX FOR ALL MICRO-INVERTER / AC MODULE INSTALLS (IF APPLICABLE). 13 14 LABELING NOTES: 1.LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2.LABELING REQUIREMENTS BASED ON THE 2014 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3.MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4.LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21] 5.LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] 3 4 1 18 240 0 0 LABEL 15 PLACARD TO BE PLACED AT PRODUCTION METER PER XCEL ENERGY.PRODUCTION METER ACPV MSP M C JB JB Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: CAUTION DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN: NEC 690.56(B)&(C), [NEC 705.10]) 16484 Draft Horse Boulevard, Lakeville MN 55044 ENGINEER STAMP (IF APPLICABLE) PLACARD - PV08 DRAWN BY: SoloCADFRONT OF HOMEMAIN DISTRIBUTION UTILITY DISCONNECT RAPID SHUTDOWN AC DISCONNECT SWITCH COMBINER BOX PV ARRAY PV ARRAY SYSTEM UTILIZES MICROINVERTERS LOCATED UNDER EACH SOLAR MODULE Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE PHOTOS: ENGINEER STAMP (IF APPLICABLE) SITE PHOTOS - PV09 DRAWN BY: SoloCAD Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE PHOTOS: ENGINEER STAMP (IF APPLICABLE) FRONT/BACK VIEWS - PV09.1 DRAWN BY: SoloCAD Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE PHOTOS: ENGINEER STAMP (IF APPLICABLE) SIDE VIEWS - PV09.2 DRAWN BY: SoloCAD Xcel Energy MN SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) DATE: June 30, 2021 Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: SITE PHOTOS: ENGINEER STAMP (IF APPLICABLE) METER/OPEN MSP - PV09.3 DRAWN BY: SoloCAD DATE: June 30, 2021 SITE INFORMATION Doreen Ehler 16484 Draft Horse Boulevard Lakeville, MN 55044 AC SYSTEM SIZE: 4.384 kW AC DC SYSTEM SIZE: 5.76 kW DC Lat, 44.7100787 Long, -93.1575316 (16) SIL-360 NX mono PERC PV MODULES (8) AP Systems YC600 INVERTER(S) Xcel Energy MN Everlight Solar Construction 7369 Highway 13 W Savage, MN 55378 License# BC771658 833.786.4387 ext. 701 CONTRACTOR INFORMATION: ENGINEER STAMP (IF APPLICABLE) TEST PROCEDURE - PV10 DRAWN BY: SoloCAD Contact Info and General 1.Name of Customer who owns service, the Xcel Energy “customer of record” for existing services 2.Installation premise address shall match application address 2.1 Address shall match the premise address for existing customer/services 3.Application OID, SRC, or case number assigned to the project 4.A note stating “All testing shall be performed by qualified personnel" Testing Applicable to all DER 5.The procedure shall provide steps to verify fixed power factor settings for each inverter meet the project requirements 6.The unintentional islanding test shall at minimum contain the following steps: 6.1 Steps that verify DER system is ready to be energized 6.2 Steps to verify labeling for the Main Service Panel, DER Protection, DC Disconnect, AC disconnect, Utility AC disconnect, Production Meter (when applicable) and other relevant labelling and signage 6.3 Steps to energize the DER system 6.4 While in normal operation, steps to verify the voltages at the DER AC terminals are within 5% of the combined DER AC voltage ratings and all LEDs, alarms, and/or LCD codes are “normal” 6.5 While in normal operation, steps to verify that all DER units are operational and producing power 6.6 Steps to simulate the loss of utility source11 for the unintentional islanding test shall be listed 6.6.1 Clearly identify the disconnection device being used to simulate this utility power outage 6.7 Using a voltmeter, verify the voltage at the inverter side of the AC disconnect has dropped to zero 6.7.1 Only customer-owned equipment shall be used for this verification. Xcel Energy will not provide special equipment for this verification. Xcel Energy provided meters shall not be used for this verification. 6.8 Using an ammeter or the DER’s display/metering, verify the DER has ceased to energize within two seconds. For three phase systems, three phase monitoring may be required. 7.Verify DER LEDs, alarms, and/or LCD codes are appropriate for loss of Utility source 8.Steps to restore the lost Utility source shall be listed 9.A step to verify that the inverter system delays five (5) minutes before resuming power output after the Utility source is restored shall be listed CASE # 04511091 BAAARRABAAARRAINDUSTRY LEADING WARRANTYAll our products include an industry leading 25-year product workmanship and 30-year performance warranty.35+ YEARS OF SOLAR INNOVATIONLeveraging over 35+ years of worldwide experience in the solar industry, Silfab is dedicated to superior manufacturing processes and innovations such as Bifacial and Back Contact technologies, to ensure our partners have the latest in solar innovation.NORTH AMERICAN QUALITYSilfab is the leading automated solar module manufacturer in North America. Utilizing premium quality materials and strict quality control management to deliver PV modules. BAA / ARRA COMPLIANTSilfab panels are designed and manufactured to meet Buy American Act Compliance. The US State Department, US Military and FAA have all utilized Silfab panels in their solar installations. LIGHT AND DURABLE Engineered to accommodate high wind load conditions for test loads validated up to 4000Pa uplift. The light-weight frame is exclusively designed for wide-ranging racking compatibility and durability.QUALITY MATTERS Total automation ensures strict quality controls during the DOMESTIC OPERATIONSOur 500+ North American team is ready to help our partners win the hearts and minds of customers, providing customer AESTHETICALLY PLEASINGcommercial applications.PID RESISTANTPID Resistant due to advanced cell technology and material selection. In accordance to IEC 62804-1.* Chubb provides error and omission insurance to Silfab Solar Inc.ProudPartner ofSilfab Solar Inc.240 Courtneypark Drive EastMississauga ON L5T 2Y3 CanadaTel +1 905-255-2501 | Fax +1 905-696-0267info@silfabsolar.com | www.silfabsolar.comSilfab Solar Inc.800 Cornwall AveBellingham WA 98225 USATel +1 360-569-4733SIL-360 NX mono PERCTest Conditions STC NOCTModule Power (Pmax) Wp 360 258Maximum power voltage (Vpmax) V 36.6 33.1Maximum power current (Ipmax) A 9.9 7.8Open circuit voltage (Voc) V 44.5 40.4Short circuit current (Isc) A 10.5 8.2% 19.7 17.6Maximum system voltage (VDC) V 1000Series fuse rating A 20Power Tolerance Wp 0 to +10• Sun simulator calibration reference modules from Fraunhofer Institute. Electrical characteristics may vary by ±5% and power by 0 to +10W.SIL-360 NX mono PERC +0.064 %/°C-0.28 %/°C-0.36 %/°CNOCT (± 2°C) 46 °COperating temperature -40/+85 °CSIL-360 NX mono PERCMetric ImperialModule weight 20±0.2 kg 44±0.4 lbsDimensions (H x L x D) 1832 mm x 1000 mm x 38 mm 72.13 in x 39.4 in x 1.5 inMaximum surface load (wind/snow)* 4000 Pa rear load / 5400 Pa front load 83.5/112.8 lb/ft^2Hail impact resistance ø 25 mm at 83 km/h ø 1 in at 51.6 mphCells66 - Si mono-PERC - 5 busbar158.75 x 158.75 mm66 - Si mono-PERC - 5 busbar62.25 x 62.25 inGlass3.2 mm high transmittance, tempered, 0.126 in high transmittance, tempered, Cables and connectors (refer to installation manual)1200 mm ø 5.7 mm, MC4 from Staubli 47.2 in, ø 0.22 (12AWG), MC4 from Staubli BacksheetFrame Anodized Aluminum (Black)Bypass diodesJunction BoxSIL-360 NX mono PERCModule product workmanship warranty 25 years**Linear power performance guarantee30 yearsst year91.6% end 12th year 85.1% end 25th year 82.6% end 30th yearSIL-360 NX mono PERCProductULC ORD C1703, UL1703, CEC listed***, UL 61215-1/-1-1/-2, UL 61730-1/-2, IEC 61215-1/-1-1/-2***. IEC 61730-1/-2***, CSA C22.2#61730-1/-2, IEC 62716Ammonia Corrosion; IEC61701:2011 Salt Mist Corrosion Certifed, UL Fire Rating: Type 2Factory ISO9001:2015All states except CaliforniaModules Per Pallet: 26Pallets Per Truck: 34Modules Per Truck: 8847.87" [200mm]16.67" [423.5mm]38.78" [985mm]2.36" [60mm]38.11" [968mm]Mounting Hole(x4)Drainage (x8)Ø4.2mm (x2)Grounding Hole47.24"[1200mm]39.37" [1000mm]72.13" [1832mm]1.5" [38mm]72.13" [1832mm]1.02" [26mm]0.07" [1.8mm]1.5" [38mm]0.47" [12mm]0.39" [10mm]0.28" [7mm]C C* Warning. Read the Safety and Installation Manual installing and operating modules.**12 year extendable to 25 years subject to regis-tration and conditions outlined under “Warranty” at www.silfabsolar.com.data are available for download at: www.silfabsolar.com/downloads.CaliforniaModules Per Pallet: 26Pallets Per Truck: 32Modules Per Truck: 832Everlight SolarTel 833-786-4387www.everlightsolar.com THESE SHEETS, DESIGNS, AND SPECS ARE PROPERTY OF SUN INCORPORATED. NO PART SHALL BE DUPLICATED OR USED FOR NONE OTHER THAN ITS SPECIFIC PROJECT WITHOUT WRITTEN CONSENT FROM SUN INCORPORATED.MOUNT SHEETSheet: 5File: \\SUN-SERVER\Sun Incorporated Jobs Master\Equipment\MOUNTS\QUICK MOUNT\QMPV-datasheet-QMHSS-LS-QuickHookSM-web.pdfMissing or invalid referenceSheet: 2File: \\SUN-SERVER\Sun Incorporated Jobs Master\Equipment\MOUNTS\QUICK MOUNT\QMPV-datasheet-QMHSS-LS-QuickHookSM-web.pdfMissing or invalid reference Milbank Manufacturing | 4801 Deramus Ave., Kansas City, MO 64120 | 877.483.5314 | milbankworks.com Please consult serving utility for their requirements prior to ordering or installing, as specifications and approvals vary by utility and may require local electrical inspector approval. All installations must be installed by a licensed electrician and must comply with all national and local codes, laws and regulations. Milbank reserves the right to make changes in specifications and features shown without notice or obligation. Catalog Number K4977-INT Marketing Product Description Tap Connector Kit Internal Hex Slide Nut With 14-1/0 Box Connector 300 Volt Maximum 3 Per Kit UPC 784572274365 Length (IN)8 Width (IN)1.536 Height (IN)7.5 Weight (LB)0.5 Brand Name Milbank Type Wire Connector Kit Application Metering Accessory Standard Non UL Listed Size 8L x 1.536W x 7.5H Connection Mechanical Conductor Range 12 AWG to 1/0 AWG Consist Of Connector Mounting Slide Nut Number Of Conductors 0 Material Aluminum Voltage Rating Up to 300 Volts Alternating Current Insulation None Temperature Rating 75 Degrees Celsius K4977-INT 1028693