Loading...
HomeMy WebLinkAbout20117 Geneva Trail SurveySTOSTOSTOSANSANSANSANSANSANWATWATWATSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOLOT 2Proposed HouseBuckingham EJ04, Elev. A2WLookoutLowest Floor Elev. = (1036.93)Top of Foundation @ Lookout Elev.= (1040.10)Building Pad per Grading Plan 1GENEVA TRAIL Vacate lotVacate lot(1041.1) X(1044.1) XN89°57'17"E 95.0050.00 N00°02'43"WN89°57'17"E 95.00N00°02'43"W 50.00 (7.1%)GaragePorchSi d e w a l k 16.001041.331043.831041.601038.97X 1 0 42 .9 7 TCX 1042.31REX 1041.97TCX 1040.42TCX 1 0 4 2 . 4 6 Drainage & Utility Easement over all of Lot 10, Block 1 per the plat of CEDAR HILLS CS(1044.60)1040.7 X1037.7 X Sidewalk Sidewalk(1038.9) X(1038.9) XX (1039.4)X (1039.4)1046104210401038103610381040 104210441044 104439.0025.0010.00CoveredDeck5.0023.50 5.13 17.1210.0012.00 31.370.12 24.5021.5010.125.63 8.0012.7563.7527.75 4.0019.006.130.12 15.1365.8714.0014.0065.8715.135.005.1315.1312.00 10.00X 1043 . 0 1 X 1044. 3 21042.8 XX 1040.0X 1038.8 1041.3 XX 104 1 . 9 0 X 10 4 0 . 6 0 N:\0025850.01\DWG\SURVEY\0025850.01B01L02.DWG 03/11/2021Lakeville, MinnesotaCedar HillsCertificate of Survey11OF.MJWBTWLennarDATE:PREPARED FOR:Phone(952) 937-515012701 Whitewater Drive, Suite #300Fax(952) 937-5822Minnetonka, MN 55343Toll Free(888) 937-5150SHEET NUMBER:.FIELD CREW:DRAWN:CHECKED:DESIGNED:Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QFCommon Ground AllianceCall 48 Hours before digging:811 or call811.comPROJECT NUMBER: 0025850.000'20'40'LEGENDCABLE TV BOXTVNATURAL GAS METERGSTREET LIGHTELECTRIC BOXEELECTRIC METERESANITARY MANHOLESSEWER CLEANOUTCOCATCH BASINSTORM MANHOLESTTELEPHONE BOXTGATE VALVEHYDRANTWATER METERWCURB STOP BOXCSWATERMAINSANITARY SEWERSTORM SEWERSANSTOWATFLARED END SECTION1) Curb & gutter and utilities are existing.2) Building dimensions do not reflect brick facing.3) Building shown reflects Buckingham plan foundation plan, sheetA2, dated 05/01/2021Lot 2, Block 1, CEDAR HILLS, according to therecorded plat thereof, Dakota County, Minnesota.Address-20117 Geneva TrailGarage Floor Elev. = (1044.60)(at overhead door)Top of Poured Foundation Wall Elev. = (1044.93)Lowest Floor Elev. = (1036.93)Top of Foundation @ Lookout Elev. = (1040.10)I hereby certify that this survey was prepared by me or undermy direct supervision and that I am a duly Licensed LandSurveyor under the laws of the State of Minnesota. 07/01/2021Mathew J. Welinski DateMinnesota License No. 53596matt.welinski@westwoodps.comDenotes iron monument foundDenotes iron monument setx xxx.x Denotes existing elevationx (xxx.xx) Denotes proposed elevationBenchmark- Minnesota Department of Transportation Control Point "1914 H",Elevation = 959.11 (N.A.V.D. 1988), not graphically shown.IMPERVIOUS SURFACE CALCULATIONSLot area = 4,750 sq. ft.House area = 2,418 sq. ft.Porch area = 160 sq. ftCovered Deck area = 120 sq. ft.Driveway and Sidewalk = 252 sq. ft.Impervious area 2,950 sq. ft. / 62.1% of total of lot areaLOT GRADING CALCULATIONSBasement Excavation = 249 cubic yardsFinished Lot Grading= 63 cubic yardsMaterial (excess/needed)186 cubic yards (excess)Planning DepartmentApprovedDate:__________________07/07/2021kjenson*Draintile connection required.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________07/12/2021jpesikEROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.