Loading...
HomeMy WebLinkAbout7680 205th St WCITY OF LAKEVILLE CERTIFICATION OF GRADING AND FINAL PLACEMENT OF IRON MONUMENTS Building Pennit # 182734 Legal Description Lot 9 Block 2 Subdivision CEDAR CROSSINGS Address 7680 205th Street West RECEIVED By Joey Pesik at 10:07 am, Jul 12, 2021 I hereby certify that on the 21 st day of June, 2021 an inspection of this property was conducted by me or under my direct supervision and that the as -built grades, elevations and drainage patterns of the site and building are in conformance with the grading plan approved by the City Engineer or amendments previously approved by the City Engineer In addition, all property corner monuments are in place as of this date I hereby certify that this survey plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota Signature Print Name Date EETT Marcus F Hamnton 6/21/2021 MN License # 47481 NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS - BUILT GRADES. ELEVATIONS AND DRAINAGE PATTERNS Approved subdivision grading plans should be obtained from the property owner or developer General questions relating to the building permit should be directed to the Building Inspections Department at 952-985-4440 Questions relating to grading should be directed to the Engineenng Department at 952-985-4500 Prior to release of the Grading Security, this document shall be filed with: City of Lakeville Engineering Department 20195 Holyoke Avenue Lakeville, MN 55044 11x17 SCALE IN FEET 9 30' 60' A O • 0 tc x900.0 (930.0) x[900.0] Denotes set spike Denotes set iron monument Denotes found iron monument Denotes found scribed "x" Denotes set hub Denotes proposed drainage Denotes top of curb Denotes existing elevation Denotes proposed elevation Denotes as -built elevation \EXISTI,NG HOUSE (SEWO) PATIO 0 C.O. EE S� - T 205TH _ 16"' 6, 3° 55 R=7 90•00 971.5 [978.8]tc c - 18.0 -- , 54.06 0 ---- - - - - i979.53 7 1(978.2 256] 1' 3.5) c � � (:5r N1 . (P "qy-C 5 1 I (99ao.7j f 0 9- 9.7 �,,19.17 M g� �y.83 0/%, c 0 ARAGE co O n / z .P 3 I r.\:-''''s.,0,0 vo a \ N.(4(.s1j:.4:,'c,:o......i EXISTING - , ` I IJ,,, \I,_/06st H ". . 46.0 g' 7.3, ,u3 (980.6i r: w% ' ' 9) PATIO v J vl ...1I 4: _ OBI �' °� f0 I o00 IX 976.3] [976.4] Nx [973.43 x [973.61 p [972.61 c I :042 LOT 9. x ri 22. ,_ DRAINAGE & UTILITY v= , 0 5I i. EASEMENT PER PLAT `, 2 _ - - _ 0 RE _ ' 0 969.9 [s7 .9 -\ 70.4] (970.9) `- - 1 74.66 CATCH BASIN N86°55'12"E ----- ELEVO (9 13 3] C.O. wgST _w30°405»E ,716.97 [975.4]t� nT L_\J I 1 ti 1 [97 [977.2.3 O 15 �-1 (980 5) rn a) [9130.7�] j`i [97�� CH Y� POR17.6J I 17.0 co SIDEWALK [976.17 EXIS�NG (976.1� N -2 J [975.7] I nT L_\J I 0 L 0 g 7.4 [968.0] (968.0) 0 C.O. CATCH BASIN ---TOP OF RIM ELEV.=[967.5] I r T L_U I 1 I PROPERTY DESCRIPTION Lot 9, Block 2, CEDAR CROSSINGS, Dakota County, Minnesota PROPERTY ADDRESS 7680 205th Street West, Lakeville, Minnesota NOTES 1. Bearings are based on the recorded plat. 2. Building dimensions shown are for horizontal and vertical placement of structure only. See architectural plans for building and foundation dimensions. 3. No specific soils investigation has been completed on this lot by James R. Hill, Inc. the suitability of soils to support the specific house proposed is not the responsibility ofJames R. Hill, Inc. or the surveyor. 4. No specific title search for existence or non-existence of recorded or un-recorded easements has been conducted by the surveyor as a part of this survey. Only easements per the recorded plat are shown. 5. Proposed grades shown were taken from the grading &/or development plan prepared by James R. Hill, Inc. 6. Grading plan date/revision date: July 13, 2018 7. Plan No. 3020-A'EVERETT' BENCHMARK Top nut of hydrant located at Lot 10, Block 2 = 975.70 FLOOR ELEVATIONS Garage Floor @ Front Garage Top of Foundation House Top of Foundation Lowest Floor Proposed Asbuilt = 980.7 = 980.9 = 981.1 = 981.1 = 981.1 = 981.1 = 977.9 = 978.0 HARD COVER CALCULATIONS Lot House/Garage Porch Driveway Sidewalk Patio Total Impervious = 10,440 sq. ft. = 2,304 sq. ft. = 111 sq. ft. = 687 sq. ft. = 29 sq. ft. = 18 sq. ft. = 3,149 sq. ft. or 30.16% of lot DRIVEWAY TOTAL - 984 S F. SURVEYOR'S CERTIFICATE I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. That this survey does not purport to show all improvements, easements or encroachments, to the property except as shown thereon. Signed this 2nd day ofJuly, 2020 Ma us F. aFf mpton, MN47rSridur1 v co) a) E LLI rr r LLJ G) CC >- w ▪ CC OD OD CC w w CD w C/) CC w 0 0 co E 8 J J � cc 0 cr cs cr cc CV U cn o C`_7 C./) 0 C cal LLJ 0 U 0 C\ U 0 O _ 0) 0 J DRAWN BY SHP/LT DATE 7/02/2020 REVISIONS A 6/21/21 FhaIGradsAc�x,iU CAD FILE 400623 dwg PROJECT NO. 400623 SHEET 1 OF 1