Loading...
HomeMy WebLinkAboutLA193293 - 817 Macbeth Cir - Test Affidavit �'C� /����-�„` �i��-- �. �� �� ' , �� Manufactured Home Svstems Test Affidavit This form must be completed in its entirety and be submitted at the Building Final inspection for the installation of a manufactured home. All tests must be completed and signed off on this form. A certificate of occupancy will not be issued until this completed form is received. SYSTEMS TEST VERIFICATION Description Date Passed Signature of Tester Drain Line: Pursuant to CFR 3280.612(b) Date:���'.�� � � Print Name of Tester and Company: S � � � �,� � ���°� Water Llne: Pursuant to CFR 3280.612(a) Date; 7,.,���� / Print Name of Tester and Company: � C,��,� Fixture Test: Pursuant to CFR 3280.612(c) Date: 7.--�� Print Name of Tester and Company: � /� GaS TeSt: Pursuant to CFR 3280.705 and IFGC 406.4 Date: ?,��v� � ) � � Print Name of Tester and Company: �p�,,c� ,y��s�',�r �p�„� �,,,.� ��-��� EIeCt�iCel Op@�at101181: Pursuant to CFR 3285.702 Date: �Z�S Z� Print Name of Tester and Gompany:�Glj S`o '��s �f,Cj^�"jU„�� ,�/L�.'�i'iG EleCtr'IC81 POla1'ity: Pursuant to CFR 3285.702 Date: ���6�Z� Print Name of Tester and Company: �Lia►� ��.��� j'��GL�.✓� ,C'�LG'��"rG EIeCt�iCal C011tlt1ulty: Pursuant to CFR 3285.702 Date: � Z6- z/ � Print Name of Tester and Company: ��� �j,(�f/'S ���/z f�►i�y ,(GG�i',G SlllOk@ AI81'Itl T@St: Pursuant to CFR 3280.208 Date: ?Z .Z6�Z f Print Name of Tester and Company: � I certify the above systems testing has been completed and was found to be in compliance with the provisions identified for each systems test Si nature: Date: � ``