Loading...
HomeMy WebLinkAbout19741 Henley Lane SurveyZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________07/27/2021 jpesik EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.