HomeMy WebLinkAbout17917 Hayes Avenue SurveyZoning = RS-4ENGINEERING REVIEWEDDate:__________________03/03/2021lvlasatyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION