Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA190035 Helical Report
Installer's Name:Nick Mike Noah Craig W Installation Checklist Franchisee Location:Minnesota Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Installation Date:5/12/21 Name of Customer or Contractor:Lakeshore Managent Description of customer project:Manufactured home Project Address:825 Macbeth circle Pile Number Required Compression Capacity Required Torque Pile Used Helix Used Total Pile Length (if not 7') Cut-off Elevation (if not 8" +-2) Inclination of Pile (if not 90 Degrees +-2)Torque Achieved Achieved Compression Capacity Achieved Tension Capacity Pile 1:5400 1200 2 7/8”15”2120 Pile 2:5400 1200 2 7/8”15”1974 Pile 3:5400 1200 2 7/8”15”1650 Pile 4:5400 1200 2 7/8”15”2280 Pile 5:5400 1200 2 7/8”15”1213 Pile 6:5400 1200 2 7/8”15”1212 Pile 7:5400 1200 2 7/8”9”1220 Pile 8:5400 1200 2 7/8”15”2230 Pile 9:5400 1200 2 7/8”15”2640 Pile 10:5400 1200 2 7/8”15”2222 Pile 11:5400 1200 2 7/8”15”2916 Pile 12:5400 1200 2 7/8”15”1203 Pile 13:5400 1200 2 7/8”15”2290 Pile 14:5400 1200 2 7/8”11”1218 Draw your project here: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 1 of 2 Pile 15:5400 1200 2 7/8”15"2055 Pile 16:5400 1200 2 7/8”15"2025 Pile 17:5400 1200 2 7/8”15"2890 8 7 6 5 4 3 2 1 9 12 10 14 13 11 HOUSE 19 18 17 16 15 20 25 26 24 21 23 22 STREET 1 Pile 18:5400 1200 2 7/8”15"2060 Pile 19:5400 1200 2 7/8”15"1233 Pile 20:5400 1200 2 7/8”15"1652 Pile 21:5400 1200 2 7/8”15"2570 Pile 22:5400 1200 2 7/8”15"1430 Pile 23:5400 1200 2 7/8”15"2070 Pile 24:5400 1200 2 7/8”15"2730 Pile 25:5400 1200 2 7/8”15”1214 Pile 26:5400 1200 2 7/8”15”1840 Pile 27:5400 1200 2 7/8”15" Pile 28:5400 1200 2 7/8”15" Pile 29 5400 1000 2 7/8”11” Pile 30:5400 1000 2 7/8”11” Pile 31:5400 1000 2 7/8”11” Pile 32:5400 1000 2 7/8”11” The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 2 of 2 2