HomeMy WebLinkAbout9863 189th Street SurveyZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________08/12/2021 jpesik
EROSION CONTROL MUST BE INSTALLED
BEFORE EXCAVATION
*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.