Loading...
HomeMy WebLinkAbout9863 189th Street SurveyZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________08/12/2021 jpesik EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.