Loading...
HomeMy WebLinkAbout9831 189th Street SurveyZoning = RS-3 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________08/09/2021 jpesik EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION Correct tree preservation per City Forester Email