HomeMy WebLinkAbout9831 189th Street SurveyZoning = RS-3
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
ENGINEERING REVIEWED
Date:__________________08/09/2021 jpesik
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
Correct tree preservation per
City Forester Email