Loading...
HomeMy WebLinkAboutLA193297 - 845 MacBeth - Affidavit � � � 1�� c �� �"� ��0�2� • Manufactured Home Svstems Test Affidavit This form must be completed in its entirety and be submitted at the Building Final inspection for the installation of a manufactured home. All tests must be completed and signed off on this form. A certificate of occupancy will not be issued until this completed form is received. SYSTEMS TEST VERIFICATION Description Date Passed Signature of Tester DI'a111 L111@: Pursuartt to CFR 3280.612(b) Date: -. � —� � Print Name of Tester artd Company: � .,v� .� Y G�O � e — C�'� Water Line: Pursuant to CFR 3280.612(a) Date: ���. Print Name of Tester and Company: ����� FiXture Test: Pursuant to CFR 3280.612(c) Date: �����Zl Pnnt Name of Tester and Company: � � GaS TeSt: Pursuant to CFR 3280.705 and IFGC 406.4 Date: 7.�p,'�. / � oi�1�-c Print Name of Tester and Company: ��V�N _ ��S�e✓ h'ta�%l'� Y'�e►^^�Q �N fu�4 EIeCt1'iC81 Op�P1t101181: Pursuant to CFR 3285.702 Date: _�;y � � � Print Name of T e s ter an d Company: �-�� 5�v� �,M .��f� ir�t-r�G�-. �71z L '� Electrical Polarity: Pursuant to cFR 3as5.�o2 �ate: S_�( Print Name of Tester and Company: � ElectricalContinuity: PursuanttoCFR3285.702 Date: ���.s�/ ! Print Name of Tester and Company: Smoke Alarm Test: Pursuant to CFR 3280.208 Date: g.�,�Z ' r Print Name of Tester and Gompany: ����z� I certify the above s stems testing has been completed and was found to be in compliance witti the provisions identified for each systems test: � Si nature: ��� '� � Date: