Loading...
HomeMy WebLinkAboutLA190039 Helical ReportInstaller's Name:Craig W and Craig E Installation Checklist Franchisee Location:Minnesota Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Installation Date:5/13/21 Name of Customer or Contractor:Lakeshore Management Description of customer project:24x44 Clayton Project Address:851 Macbeth circle Pile Number Required Compression Capacity Required Torque Pile Used Helix Used Total Pile Length (if not 7') Cut-off Elevation (if not 8" +-2) Inclination of Pile (if not 90 Degrees +-2)Torque Achieved Achieved Compression Capacity Achieved Tension Capacity Pile 1:5400 1200 2 7/8”15”4000 Pile 2:5400 1200 2 7/8”15”8’6500 Pile 3:5400 1200 2 7/8”15”9’5025 Pile 4:5400 1200 2 7/8”15”13’1625 Pile 5:5400 1200 2 7/8”15”10’1438 Pile 6:5400 1200 2 7/8”15”1200 Pile 7:5400 1200 2 7/8”15”1324 Pile 8:5400 1200 2 7/8”15”10’1250 Pile 9:5400 1200 2 7/8”15”1460 Pile 10:5400 1200 2 7/8”15”2750 Pile 11:5400 1200 2 7/8”15”10’1300 Pile 12:5400 1200 2 7/8”15”10’2400 Pile 13:5400 1200 2 7/8”15”2500 Pile 14:5400 1200 2 7/8”15”1569 Draw your project here: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 1 of 2 Pile 15:5400 1200 2 7/8”15"1206 Pile 16:5400 1200 2 7/8”15"5’1233 Pile 17:5400 1200 2 7/8”15"4000 8 7 6 5 4 3 2 1 9 12 10 14 13 11 HOUSE 19 18 17 16 15 20 25 26 24 21 23 22 STREET 30 29 28 27 1 Pile 18:5400 1200 2 7/8”15"3000 Pile 19:5400 1200 2 7/8”15"10’1400 Pile 20:5400 1200 2 7/8”15"10’1341 Pile 21:5400 1200 2 7/8”15"13’1268 Pile 22:5400 1200 2 7/8”15"10’1900 Pile 23:5400 1200 2 7/8”15"1430 Pile 24:5400 1200 2 7/8”15"10’1306 Pile 25:5400 1200 2 7/8”15"10’1500 Pile 26:5400 1200 2 7/8”15"1310 Pile 27:5400 1200 2 7/8”15"1350 Pile 28:5400 1200 2 7/8”11”10’1282 Pile 29 5400 1000 2 7/8”15”1600 Pile 30:5400 1000 2 7/8”11” Pile 31:5400 1000 2 7/8”11” Pile 32:5400 1000 2 7/8”11” The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 2 of 2 2