Loading...
HomeMy WebLinkAboutLA193838 Helical ReportInstaller's Name:Noah and Craig W Installation Checklist Franchisee Location:Minnesota Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Installation Date:5/13/21 Name of Customer or Contractor:Lakeshore Management Description of customer project:Project Address:603 Macbeth circle Pile Number Required Compression Capacity Required Torque Pile Used Helix Used Total Pile Length (if not 7') Cut-off Elevation (if not 8" +-2) Inclination of Pile (if not 90 Degrees +-2)Torque Achieved Achieved Compression Capacity Achieved Tension Capacity Pile 1:5400 1200 2 7/8”15”1810 Pile 2:5400 1200 2 7/8”15”8’1280 Pile 3:5400 1200 2 7/8”15”9’1780 Pile 4:5400 1200 2 7/8”15”13’1203 Pile 5:5400 1200 2 7/8”15”10’1201 Pile 6:5400 1200 2 7/8”15”1250 Pile 7:5400 1200 2 7/8”15”1205 Pile 8:5400 1200 2 7/8”15”10’2360 Pile 9:5400 1200 2 7/8”15”2150 Pile 10:5400 1200 2 7/8”15”1740 Pile 11:5400 1200 2 7/8”15”10’1203 Pile 12:5400 1200 2 7/8”15”10’1205 Pile 13:5400 1200 2 7/8”15”1222 Pile 14:5400 1200 2 7/8”15”1380 Draw your project here: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 1 of 2 Pile 15:5400 1200 2 7/8”15"1920 Pile 16:5400 1200 2 7/8”15"5’2250 Pile 17:5400 1200 2 7/8”15"1560 8 7 6 5 4 3 2 1 9 12 10 14 13 11 HOUSE 19 18 17 16 15 20 25 26 24 21 23 22 STREET 30 29 28 27 1 Pile 18:5400 1200 2 7/8”15"1203 Pile 19:5400 1200 2 7/8”15"10’1222 Pile 20:5400 1200 2 7/8”15"10’1213 Pile 21:5400 1200 2 7/8”15"13’1268 Pile 22:5400 1200 2 7/8”15"10’3540 Pile 23:5400 1200 2 7/8”15"2860 Pile 24:5400 1200 2 7/8”15"10’1200 Pile 25:5400 1200 2 7/8”15"10’1245 Pile 26:5400 1200 2 7/8”15"1222 Pile 27:5400 1200 2 7/8”15"1420 Pile 28:5400 1200 2 7/8”11”10’1278 Pile 29 5400 1000 2 7/8”15”1301 Pile 30:5400 1000 2 7/8”15”1229 Pile 31:5400 1000 2 7/8”11” Pile 32:5400 1000 2 7/8”11” The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 2 of 2 2