Loading...
HomeMy WebLinkAbout19004 Inndale Drive SurveyZoning = RS-3*Draintile connection required.ENGINEERING REVIEWEDDate:__________________08/12/2021jpesik*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.