Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA191678 Helical Report
Installer's Name:Zayron and Luke Installation Checklist Franchisee Location:Minnesota Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Installation Date:8/12/21 Name of Customer or Contractor:Lakeshore management Description of customer project:16x66 Friendship Project Address:715 Romeo Dr Pile Number Required Compression Capacity Required Torque Pile Used Helix Used Total Pile Length (if not 7') Cut-off Elevation (if not 8" +-2) Inclination of Pile (if not 90 Degrees +-2)Torque Achieved Achieved Compression Capacity Achieved Tension Capacity Pile 1:8100 1800 2 7/8”15”3100 Pile 2:8100 1800 2 7/8”11”1800 Pile 3:8100 1800 2 7/8”15”2000 Pile 4:8100 1800 2 7/8”11”1822 Pile 5:8100 1800 2 7/8”15”1807 Pile 6:8100 1800 2 7/8”15”3500 Pile 7:8100 1800 2 7/8”17”1837 Pile 8:8100 1800 2 7/8”17”2005 Pile 9:8100 1800 2 7/8”15”1811 Pile 10:8100 1800 2 7/8”15”1834 Pile 11:8100 1800 2 7/8”11”2008 Pile 12:8100 1800 2 7/8”15”2800 Pile 13:8100 1800 2 7/8”15”6022 Pile 14:8100 1800 2 7/8”11”1807 Pile 15:8100 1800 2 7/8”15”6032 Pile 16:8100 1800 2 7/8”15”1804 Pile 17:8100 1800 2 7/8”15”1843 Pile 18:8100 1800 2 7/8”15”3500 Pile 19:8100 1800 2 7/8”15”3510 Pile 20:8100 1800 2 7/8”15”1870 Pile 21: Pile 22: Pile 23: Pile 24: Pile 25: Pile 26: Pile 27: Pile 28: Pile 29: Pile 30: Pile 31: Pile 32: Pile 33: Pile 34: Pile 35: Pile 36: 1 1 715 Romeo 14 2 15 3 16 4 17 5 18 6 19 7 20 98 10 1211 13 8’ 8’ 8’4’4’4’8’8’8’8’ 8’8’ 4’8’8’4’ 8’ 8’ 8’ 4’ 8’ 8’8’ 8’ Street 2 The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 2 of 2 3 4 5 6