HomeMy WebLinkAbout8166 180th Street West SurveyNOTESHARD COVER CALCULATIONSPROPERTY DESCRIPTION8166 180th Street West, Lakeville, MinnesotaPROPERTY ADDRESSSURVEYOR'S CERTIFICATEFLOOR ELEVATIONSDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationPHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FORDRAWN BYDATEREVISIONSCAD FILEPROJECT NO.SHEET 1 OF 1411045.dwg4110452999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Lot 4, Block 4, SUMMERS CREEK 2ND ADDITION, Dakota County, Minnesota1. Bearings are based on the recorded plat.2. Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3. No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4. No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5. Proposed grades shown were taken from the grading &/ordevelopment plan prepared by Westwood Professional Services, Inc.6. Grading plan date/revision date: March 3, 20217. Plan No. 5465-B 'HARRISON'Lot = 9,425 sq. ft.House/Garage = 1,768 sq. ft.Porch = 123 sq. ft.Driveway = 720 sq. ft.Sidewalk = 43 sq. ft.Total Impervious = 2,654 sq. ft. or 28.16% of lotI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 23rd day of August, 2021Marcus F. Hampton, MN L.S. No. 47481Lot 4, Block 4, SUMMERS CREEK
2ND ADDITION8/23/2021Dakota County, MinnesotaProposedGarage Floor @ Front = 1030.9Garage Top of Block = 1031.3House Top of Block = 1031.3Lowest Floor = 1023.3Top of Foundationat Lookout Window = 1026.5BENCHMARKA. 9/09/21: Stake HouseTop nut of hydrant located at Lots 5 and 6, Block 4 = 1024.70LT/SHPZoning = RS-4FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________09/22/2021jpesik*Draintile connection required.