HomeMy WebLinkAbout8212 198th St SurveyZoning = RS-3The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________08/12/2021jpesik