Loading...
HomeMy WebLinkAboutLA190280 Affidavit �� � ���� ���' � � o��� . . Manufactured Home Svstems Test Affidavit This form must be completed in its entirety and be submitted at the Building Final inspection for the installation of a manufactured home. All tests must be completed and signed off on this form. A certificate of occupancy will not be issued until this completed form is received. SYSTEMS TEST VERIFICATION Description Date Passed Signature of Tester Drain Line: Pursuant to cFR s280.s�2(b) �ate: � � ��� �� � Print Name of Tester and Company: e j-��, ��, � � _ �� WBteP LI11@: Pursuant to CFR 3280.612(a) Date: `� ,�� _„� Print Name of Tester and Company: �� ��`%r� FiXtu�e TeSt: Pursuant to CFR 3280.612(c) Date: ��� v�� Print Name of Tester and Company: � /��� G8S TeSt: Pursuant to CFR 3280.705 and IFGC 406.4 Date: �_ r�Jj � P�int Name of Tester and Company: � � , � i' �.= �e J v� �yvt uS�H✓ yM.� ��� � S�r�t`tP EleCtriCal Operational: Pursuant to CFR 3285.702 Date: rG l ��� Print Name of Tester and Company: ��-.e� ���,� �,,�u�.L �� EleCtrIC81 P018rlty: Pursuant to CFR 3285J02 Date: l���Gl �p�+ Print Name of Tester and Company: � f �C Electrical Continuity: Pursuant to CFR 3285.702 Date: ja—��-� � Print Name of Tester and Company: t� �� �� SI'Y10k@ AI8�t11 T@St: Pursuant to CFR 3280.208 Date:`� ../3_ / Print Name of Tester and Company: � I certify the above systems testing has been completed and was found to be in compliance with the provisions identified for each systems test: � �7�`--.� � D� � �'` Si nature: Date: / �