HomeMy WebLinkAboutLA190280 Affidavit ��
�
���� ���' � � o���
. .
Manufactured Home Svstems Test Affidavit
This form must be completed in its entirety and be submitted at the Building Final inspection for the installation of a
manufactured home. All tests must be completed and signed off on this form. A certificate of occupancy will not be
issued until this completed form is received.
SYSTEMS TEST VERIFICATION
Description Date Passed Signature of Tester
Drain Line: Pursuant to cFR s280.s�2(b) �ate: �
� ��� �� �
Print Name of Tester and Company: e j-��, ��, � � _ ��
WBteP LI11@: Pursuant to CFR 3280.612(a) Date: `� ,�� _„�
Print Name of Tester and Company: �� ��`%r�
FiXtu�e TeSt: Pursuant to CFR 3280.612(c) Date: ��� v��
Print Name of Tester and Company: � /���
G8S TeSt: Pursuant to CFR 3280.705 and IFGC 406.4 Date: �_ r�Jj �
P�int Name of Tester and Company: � � , � i' �.=
�e J v� �yvt uS�H✓ yM.� ��� � S�r�t`tP
EleCtriCal Operational: Pursuant to CFR 3285.702 Date: rG l ���
Print Name of Tester and Company: ��-.e� ���,� �,,�u�.L ��
EleCtrIC81 P018rlty: Pursuant to CFR 3285J02 Date: l���Gl �p�+
Print Name of Tester and Company: � f �C
Electrical Continuity: Pursuant to CFR 3285.702 Date: ja—��-� �
Print Name of Tester and Company: t� �� ��
SI'Y10k@ AI8�t11 T@St: Pursuant to CFR 3280.208 Date:`� ../3_ /
Print Name of Tester and Company: �
I certify the above systems testing has been completed and was found to be in compliance with the provisions identified for each
systems test:
� �7�`--.� � D� � �'`
Si nature: Date: / �