Loading...
HomeMy WebLinkAbout18584 Hancock Ave-SurveyPlanning DepartmentApprovedDate:__________________09/30/2021 dmorey approx location of draintile stub The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________10/07/2021 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements.