HomeMy WebLinkAbout18584 Hancock Ave-SurveyPlanning DepartmentApprovedDate:__________________09/30/2021 dmorey
approx location of
draintile stub
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________10/07/2021 corlowsky
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.