Loading...
HomeMy WebLinkAbout18628 Hancock Avenue-SurveyPlanning DepartmentApprovedDate:__________________09/30/2021 dmorey *Maintain 6" between bottom of siding and sod.*No structures in easements. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________10/13/2021 JPesik