HomeMy WebLinkAbout8068 180th Street surveyZoning = RS-4
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________10/18/2021 JPesik