HomeMy WebLinkAbout17849 Graphite Lane-SurveyApproximate draintile
service location
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________11/03/2021 corlowsky
EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.
Planning DepartmentApprovedDate:__________________11/04/2021 kjenson