Loading...
HomeMy WebLinkAbout17849 Graphite Lane-SurveyApproximate draintile service location The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________11/03/2021 corlowsky EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod.*No structures in easements. Planning DepartmentApprovedDate:__________________11/04/2021 kjenson