Loading...
HomeMy WebLinkAbout16978 Galleon Cir Survey(952.2)4 7 . 4 5 29.2629.363 5 . 3 3CANT.CANT.R:951.19TNH954.2612''952.312''952.012''951.114''949.914''948.912'' DBL951.2SERVR:946.66E X . F EN C E EX. FENCEEX. FENCE EX. SODEX. SODE X . SOD E X . SOD EXIST INGHOUSE PROPOSEDHOUSEGARAGEPORCHN5 1 ° 4 1 ' 2 7 "E 1 3 3 . 2 5 Δ=5°52'00"R=370.0037.89S44°10'33"E 54.97Δ=6°30'15"R=209.2623.76N 3 9 ° 1 9 ' 1 1 " E 7 8 . 6 3N89°33'33"W16.82N00°23'15"E 49.49 N37°27'21"W 71.00 28.00 2 2 . 5 0 3.17 2 1 . 3 3 36.67 2 1 . 8 3 11.83 2 2 . 0 0 952.1949.9950.0948.1950.7952.2952.6952.4953.3949.3948.4951.0949.9948.9947.3947.19 5 2 . 4 9 5 2 . 5 9 5 2 . 7 9 5 2 . 8 95 3 . 4 9 5 3 . 2 9 5 0 . 0 952 .995 3 .3 ( 9 5 3 . 6 ) ( 9 5 3 . 6 ) (9 5 3 . 6 ) (9 5 3 . 6 )(954.00)(952.1)(948.1)(953.3)( 9 52 .6 )(950.7)1010 1 0 2 0 2 0 5555951.3DRAINAGE &UTILITY EASEMENTGALLEON CIRCLE955.8954.3951.6950.9952.095 2 . 4 95 3 .1W.W .95 2 . 8 ( 9 5 2 . 0 ) 953 .3 ( 9 5 3 . 0 ) 9. 4%SET IPFD IPFD IP FD IP6508FD IP10795SET IPO S 3 1 . 8 3 H U B = 9 5 1 . 6 7 O S 2 0 . 0 0 H U B = 9 5 1 . 9 8 OS 2 3 . 1 7HUB= 9 5 3 . 4 1 OS 2 0 . 0 0HUB = 9 5 2 . 5 6 SET IPDENOTES EXISTING CATCH BASINDENOTES EXISTING HYDRANTDENOTES EXISTING SANITARY MANHOLEDENOTES EXISTING STORM MANHOLEDENOTES EXISTING UTILITY BOXDENOTES EXISTING SERVICE OR CLEANOUTDENOTES IRON MONUMENT FOUNDDENOTES IRON MONUMENT SETDENOTES EXISTING POWER POLEDENOTES EXISTING LIGHT POLEDENOTES EXISTING CONSERVATION POSTOR WET LAND BUFFER POSTDENOTES EXISTING TREE8" TREE000.0DENOTES WOOD HUBDENOTES NAILDENOTES EXISTING RETAINING WALLDENOTES PROPOSED RETAINING WALLDENOTES EXISTING ELEVATIONDENOTES PROPOSED ELEVATIONDENOTES AS BUILT ELEVATION(000.0)000.0DENOTES EXISTING TREELINEDENOTES DIRECTION OF SURFACE DRAINAGEDENOTES EXISTING FENCELEGENDDENOTES EXISTING F.E.S.LOT AREA : 13,270 SQ. FT.HOUSE AREA : 1,418 SQ. FT.PORCH AREA : 66 SQ. FT.DRIVEWAY AREA : 921 SQ. FT.SIDEWALK AREA : 72 SQ. FT.TOTAL IMPERVIOUS AREA : 2,477 SQ. FT. (18.7%)CERTIFICATE OF SURVEYLegal Description:= FINISHED GARAGE FLOOR ELEVATION= BASEMENT FLOOR ELEVATION= TOP OF FOUNDATION ELEVATION(954.00)(954.33)(946.33)1. No specific soils investigation has been performed on this lotby the surveyor. The suitability of the soils to support thespecific house is not the responsibility of the surveyor.2.No title information was provided for this survey. This surveydoes not purport to show all easements of record.3. See architectural plans for final building dimensions.Zoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________10/22/2021corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Draintile connection required.