HomeMy WebLinkAbout15800 Krafton Avenue SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________11/08/2021corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.Water diversion required toprevent surface water fromrunning over septic site.All existing septic or wells must beproperly abandoned and sealed.