HomeMy WebLinkAbout9910 189th Street West-SURVEYZoning = RS-3
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
ENGINEERING REVIEWED
Date:__________________11/24/2021 corlowsky
*Draintile connection required.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.