Loading...
HomeMy WebLinkAbout17817 Graphite Lane-SurveyPlanning DepartmentApprovedDate:__________________11/29/2021 kjenson The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________11/15/2021 JPesik