Loading...
HomeMy WebLinkAbout17930 Hawksbill Drive-SURVEYZoning = RS-4 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________11/27/2021 JPesik EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION