HomeMy WebLinkAbout17930 Hawksbill Drive-SURVEYZoning = RS-4
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies will
be released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
ENGINEERING REVIEWED
Date:__________________11/27/2021 JPesik
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION