Loading...
HomeMy WebLinkAbout18629 Hancock Ave SurveyPlanning DepartmentApprovedDate:__________________10/19/2021 dmorey Approximate location of draintile service The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the landscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________11/22/2021 corlowsky EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.