Loading...
HomeMy WebLinkAboutLA197616 - City of Lakeville Electrical Permit Application - 18853 Jordan Trail Lakeville MN 55044ELECTRICAL PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only ___________________ Permit Number ___________________ Received By ___________________ Date Received _______ _______ Fee Total DATE YOUR E-MAIL ADDRESS SITE ADDRESS TENANT SUITE NO. THE APPLIANT IS:RESIDENT OWNER CONTRACTOR RESIDENT OWNER NAME_________________________________________________________________________ ADDRESS______________________________________________________________________ CITY _____________________________ STATE_____________ ZIP _____________________ DAYTIME PHONE # WHERE YOU CAN BE REACHED ______________________________ CONTRACTOR Company name must be as appears on State License COMPANY NAME_______________________________________LICENSE #EA___________ ADDRESS_____________________________________________________________________ CITY _____________________________ STATE_____________ ZIP _____________________ OFFICE PHONE # ________________________ FAX #_______________________________ CONTACT NAME______________________________________ PHONE__________________ PERMIT TYPE SINGLE FAMILY TWO FAMILY TOWNHOUSE Meter Bank Single Meter MULTI-FAMILY COMMERCIAL / INDUSTRIAL MANUFACTURED HOME (Contractor Only) INSTITUTIONAL SWIMMING POOL UNDEFINED FIRE ALARM POWER SIGN OTHER (see description) Residential Addition/ Remodel Permits Available on-line TYPE OF WORK NEW MAINTENANCE/REPAIR ADDITION TENANT FINISH ALTER / REMODEL DEMOLITION OnlyLicensed Electrical Contractors can do work in a Townhouse that has meter bank instead of single meters attached to the units. Only Licensed Electrical Contractors can do work in Manufactured Home Parks. RESIDENTIAL FEES: New Construction:$135.00 + $1.00 State Surcharge (up to three trips) Repairs: +$1.00 State Surcharge (one trip) Additions, Remodel, Lower Level:$70.00 + $1.00 State Surcharge (two trips) COMMERCIAL FEES: Minimum of + $1.00 State Surcharge (one trip) JOB COST:$Example: $12,000 Job Cost 1-1/2% of contract cost up to $10,000 $10,000.00 x 1.5% = $150.00 1% of cost above $10,000 plus surcharge +$ 2,000.00 x 1% =+ 20.00 (Surcharge = Contract Cost x .0005)+$12,000 x.0005 =+6.00 TOTAL == $176.00 I hereby apply for an electrical permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Lakeville and with the Minnesota Electrical Act; that I understand this is not a permit but only an application for a permit and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of all work which requires review and approval of plans. NAME OF APPLICANT (Please Print) SIGNATURE OF APPLICANT: PLEASE NOTE: SEPARATE PERMITS ARE REQUIRED FOR ANY BUILDING, MECHANICAL & PLUMBING WORK www.lakevillemn.gov $40.00 $40.00 Submit to: permits@lakevillemn.gov 5/12/2021 Permitting@breiterplanet.com 18853 Jordan Trail,Lakeville,MN 55044 None ✔ Jeremy Leider 18853 Jordan Trail Lakeville MN 55044 617-334-5785 ✔ ✔ DETAILED DESCRIPTION OF WORK: Residential Solar Install of modules, inverters, and wire run to electric panel Jeremy Leider $0.00 FOR OFFICE USE ONLY: TYPE OF WORK INSPECTIONS NEW FINAL ADDITION FIRE ACCEPTANCE TEST ALTER/REMODEL IN FOOR HEAT ROUGH-IN SERVICE TRENCH PERMIT FEE PERMIT FEE:$ SURCHARGE:$ OTHER:$ TOTAL:$ PERMIT ISSUED BY: DATE: 0.00 COMMENTS: