The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush
with the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
ENGINEERING REVIEWED
Date:__________________12/15/2021 corlowsky
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between bottom of siding and sod.*No structures in easements.