Loading...
HomeMy WebLinkAbout17733 Everest Ave SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. ENGINEERING REVIEWED Date:__________________09/22/2021 jpesik EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. Planning DepartmentApprovedDate:__________________10/08/2021 kjenson