Loading...
HomeMy WebLinkAbout20188 Ginseng Way SurveyBuilding Pad per Grading Plan1SANSANSANSANSANSANSANSANSANSANSANSANSANSANSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTOSTO STO STO STO STO WATWATWATCO1516WAT3GINSENG WAYLOT 11Proposed HouseSalerno EV4S, Elev. E3WalkoutLowest Floor Elev. = (1034.03)Drainage & Utility Easementover all of Lot 19, Block 1GaragePorchVacate lotX (1041.2)(1040.2)EOF X1029.06RE X(102 9 . 5 ) E O F X N73°47'10"W 95.00N16°1 2 ' 5 0 " E 6 0 . 0 0N73°47'10"W 95.00N16°12'50"E 60.0010.0025.085.00 5.00 22.0015.00 10.00 21.6710.12 34.3339.7556.8813.25 7.796.13 8.9220.50 2.0015.12 5.13 24.50 15.0058.0022.0022.0058.0015.001039.841033.911033.451039.531039.90TC X1038.79TC X1039.53RE XCSCO1039.67TC X1040.24TC X1039.58TC X(6.5%)X 1039.51033.5 XX 1 0 3 0 . 5 X 1 0 3 0 . 7 1033.1 XX 1039.3Sidewalk5.0021.336.120.13 (1041. 7 0 ) X ( 1 0 3 3 . 4 ) X ( 1 0 3 2 . 9 ) X ( 1 0 3 3 . 4 ) X ( 1 0 3 2 . 9 )104410421040103810361034 1032 1030 1030 102 8 103 0 103 2 10 3 4 1 0 3 6 1 0 3 8 1040SSN:\0025850.01\DWG\SURVEY\2ND ADD\0025850.01B01L11 2ND.DWG 08/27/2021Lakeville, MinnesotaCedar HillsCertificate of Survey11OF.MJWBTWLennarDATE:PREPARED FOR:Phone(952) 937-515012701 Whitewater Drive, Suite #300Fax(952) 937-5822Minnetonka, MN 55343Toll Free(888) 937-5150SHEET NUMBER:.FIELD CREW:DRAWN:CHECKED:DESIGNED:Œ:HVWZRRG3URIHVVLRQDO6HUYLFHV,QFCommon Ground AllianceCall 48 Hours before digging:811 or call811.comPROJECT NUMBER: 0025850.000'20'40'LEGENDCABLE TV BOXTVNATURAL GAS METERGSTREET LIGHTELECTRIC BOXEELECTRIC METERESANITARY MANHOLESSEWER CLEANOUTCOCATCH BASINSTORM MANHOLESTTELEPHONE BOXTGATE VALVEHYDRANTWATER METERWCURB STOP BOXCSWATERMAINSANITARY SEWERSTORM SEWERSANSTOWATFLARED END SECTION1) Curb & gutter and utilities are under construction.2) Building dimensions do not reflect brick facing.3) Building shown reflects Salerno plan foundation plan, sheet A2.1DE, dated 05/2021.Lot 11, Block 1, CEDAR HILLS 2ND ADDITION,according to the recorded plat thereof, DakotaCounty, Minnesota.Address- 20188 Ginseng WayGarage Floor Elev. = (1041.70)(at overhead door)Top of Poured Foundation Wall Elev. = (1042.03)Lowest Floor Elev. = (1034.03)I hereby certify that this survey was prepared by me or undermy direct supervision and that I am a duly Licensed LandSurveyor under the laws of the State of Minnesota. 09/08/2021Mathew J. Welinski DateMinnesota License No. 53596matt.welinski@westwoodps.comDenotes iron monument foundDenotes iron monument setx xxx.x Denotes existing elevationx (xxx.xx) Denotes proposed elevationBenchmark- Minnesota Department of Transportation Control Point "1914 H",Elevation = 959.11 (N.A.V.D. 1988), not graphically shown.IMPERVIOUS SURFACE CALCULATIONSLot area = 5,700 sq. ft.House area = 2,456 sq. ft.Porch area = 176 sq. ft.Driveway and Sidewalk = 432 sq. ft.Impervious area 3,064 sq. ft. / 53.8% of total of lot areaLOT GRADING CALCULATIONSBasement Excavation = 110 cubic yardsFinished Lot Grading= 267 cubic yardsMaterial (excess/needed)157 cubic yards (needed)Planning DepartmentApprovedDate:__________________09/26/2021kjensonThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.ENGINEERING REVIEWEDDate:__________________09/30/2021corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.