HomeMy WebLinkAbout18563 Haven Ct SurveyZoning = RS-4Benchmark: Hydrant at north end ofHaven Court. TNH 1049.56ENGINEERING REVIEWEDDate:__________________12/20/2021corlowsky*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.