Loading...
HomeMy WebLinkAboutLA191139 - 20181 Harvest Dr Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION CITY OF LAKEVILLE BUILDING INSPECTIONS DEPARTMENT 20195 HOLYOKE AVENUE LAKEVILLE, MN 55044 952-985-4440 Office Use Only __________________ Permit Number ___________________ Received By ___________________ Date Received ___________________ Fee Total SITE ADDRESS: MAILING ADDRESS: CITY: STATE: ZIP: JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________ LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________ ESTIMATED VALUATION: PROPOSED START DATE: END DATE: (New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION: APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED) PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License) RESIDENT OWNER NAME:_______________________________________________________________________________ HOME PHONE #:_____________________________ CELL PHONE:___________________________ GENERAL CONTRACTOR Homeowner Contractor CONTRACTOR:_______________________________________________________________________ LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE) OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ PLUMBING WORK Homeowner Contractor CONTRACTOR:__________________________________________LICENSE #: PM______________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ MECHANICAL WORK Homeowner Contractor CONTRACTOR:________________________________________ _______________________________ OFFICE PHONE #:_____________________________ CELL PHONE:___________________________ ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________ BOND #:_______________________________________ EXPIRATION DATE____________________ SEWER/WATER CONTRACTOR New Construction Only NAME:________________________________________________ ______________________________ HOME PHONE _____________________________ CELL PHONE:______________________________ BOND #:_______________________________________ EXPIRATION DATE____________________ INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN. NAME OF APPLICANT (Please Print)DATE APPLICANT’S SIGNATURE: www.lakevillemn.gov RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION LOT 8, BLOCK 6, BERRES RIDGE 5TH ADDITION*ALL DOOR & WINDOW HEADERSTO BE S.P.F. #2 OR BETTERwritten consent of Planco MN, Inc. modified or used in any redesign without the priormay not be assigned or copied, and may not bemay not be re-used for any additional structures,structure. Planco MN reserves all rights. These planslicense is granted to use these plans to build oneCopyright for these drawings is owned by Planco MN,Planco MN, Inc.cBERRES RIDGE MODEL #8#21-045SMA172021STONE COTTAGE CONSTRUCTION, INC. 20181 HARVEST DRIVE, LAKEVILE FRONT ELEVATION 1/4" = 1'-0" 16x7 OVH. DR.9x7 OVH. DR.8127127124" TRIMVINYLB & BVINYLB & BVINYLB & B6128121'-6"6"WOOD PORCHVINYL SIDING4" TRIM8'-4" POURED FOUNDATION9' CEILING @ FIRST FLOORTOTAL2nd FLR.1st FLR.1,149 SQ. FT.1,254 SQ. FT.2,403 SQ. FT.SIMONTONFRONT ONLYGRIDS IN WDWS.STONE AS SHOWNFRONT & SIDES4/1210/12(4) BRACKETSVINYLB & BVINYLSIDINGWINDOWS4" BOXEDCEDAR BEAMSTONEON JOG4" TRIMFRONT ONLY4" VINYL SIDINGALL SIDESVINYL B & BFRONT ONLYWRAPSTONE 10"12x12 BOXED CEDARCOL. ON 16x16x42STONE BASETOTALBSM'T816 SQ. FT.3,219 SQ. FT. LEFT ELEVATION 1/8" = 1'-0" 812712812SIDINGVINYL SIDINGVINYL VINYLCORNERS1'-0"1'-9"812WRAPSTONE 10" RIGHT ELEVATION 1/8" = 1'-0" 7128128123'-4"STAIRLANDINGSIDINGVINYL VINYLCORNERS2'-0" REAR ELEVATION 1/8" = 1'-0" 812712SIDINGVINYL VINYLCORNERS1'-6"8121'-6"Concept Approval ONLYSubject to Field InspectionInspectorDate2020MN BldgCode01/07/2022dmathewsRevised to add screenporch and basement finish Planco MN, Inc.C#21-045SMA272021 BASEMENT PLAN 1/4" = 1'-0" UP15 R(2) 6x6 POSTON 12x16 PIER FTG.24x24 FROST FTG. UNEXCAVATED WHFURNF.D.92%SUMP FAMILY ROOM *CARPET BEDROOM *CARPET MECH/STORAGE *UNFINISHED2-9 1/2" LSL2'-8"2'-6"2'-4"4'-0"2-11 7/8" LSL FLUSHTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERSTREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERSTREATED 2x8 16" O.C.TRD. 3-2x8 FLUSHTRD. 3-2x8 FLUSH50'-0"15'-0"15'-0"14'-0"47'-0"19'-6"30'-6"11'-0"19'-6"8'-6"11'-0"40'-0" 4'-0"36'-0" 11'-8"7'-4"17'-0" 6'-6" 6'-0"6" 1'-0"44'-0"24'-6"22'-6"2'-0"20'-6"11'-6"13'-0"4'-6"5'-10"9'-8"3'-8"3'-8" 14'-0"8'-0"9"9'-6"9"5'-10"10'-8"14'-4"24'-0"6'-0"2" LEDGE8'-4" POURED FOUNDATIONWALLEDGEWALLEDGE60"11 7/8" LSL 19.2" O.C.2-2x10TREATED 4x4 CURB2x4 - 16" O.C.FTG. SIZE BY OTHERS20'-8"10"5'-10"2'-6"11 7/8" LSL 16" O.C. 18'-10"1/2 WALL2-11 7/8" LSL FLUSH42x48x12 CONC.PAD FTG. W/2-#4 REBAR EACH WAY4'-0"RADONVENTTREATED 4x6 CURB2x6 - 16" O.C.FTG. SIZE BY OTHERS9/0x5/0 SL2-9 1/2" LSL8'-4"5'-8"2-9 1/2" LSL6/0x4/0 SL7'-6"7'-6"7'-0"8'-0"LOOKOUTLOOKOUT WALKOUTWALKOUT6'-0" P.D.2-2x10”),1,6+('64)76" CANT.11 7/8" LSL 19.2" O.C. 11 7/8" LSL 19.2" O.C. 11 7/8" LSL 19.2" O.C. LOOKOUT 10'-0"14'x6' CONC. PATIOTRT. 6x6 POSTON 24"x42" CONC.TUBE FTG.TRT. 6x6 POSTON 18"x42" CONC.TUBE FTG.7'-3"6'-9"1'-0"4'-0"TRT. 2-2x10 FLUSHTRT. 2-2x10 FLUSHTRT. 2-2x8 FLUSH TRT. 2-2x8 FLUSHTREATED 2x816" O.C.TREATED 2x10 16" O.C. 5'-0" TUB & SHOWER CAST W/ C.T.F2'-6"*C.T.REF'GU.C.UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.2.2533SmokeSmokeCO Planco MN, Inc.C#21-045SMA372021 FIRST FLOOR PLAN 1/4" = 1'-0" 1,149 SQ. FT.9' CEILING @ FIRST FLOOR50'-0"15'-0"15'-0"14'-0"PED 47'-0"REF'GUP17 RDN15 R16" S.B.3'-0"9x7 OVH. DR.16x7 OVH. DR.2'-6"9/0x5/0 SL3-9 1/2" LSL2-9 1/2" LSL 6'-0" P.D.2'-4"2'-4"2'-4"2'-8"FIREDOORPANTRY*VINYL16" SH'S2'-8" C.O. FOYER *WOOD*WOOD DINING KITCHEN *WOOD*WOOD GREAT ROOM OFFICE *CARPET*4" CONC. FLOOR GARAGE WOOD PORCH 19'-6"30'-6"11'-0"19'-6"8'-6"11'-0"40'-0" 4'-0"36'-0" 11'-8"7'-4"17'-0" 6'-6" 5'-6"1'-0"1'-0"44'-0"8'-0"7'-0"7'-6"7'-6"8'-0"6'-0"2-2x10 2/0x2/0 AWN 24'-6"22'-6"2'-0"20'-6"11'-6"13'-0"6'-2"5'-4"24'-0"6'-0"6'-0"8'-4"9'-8"5'-0"7'-0"5'-11"5'-1"9'-9"9'-9"*VINYL*VINYL W.I.C. *VINYL5'-3"6'-6"5'-3"2'-0"3'-6"8'-0" CAB.3'-6"7'-1"3'-6"2'-10"6'-6"3'-8"3'-8"4'-6"6'-8"10"WALLEDGEWALLEDGE2x62x6RAIL2'-6"4'-10"7'-2" 11'-0"3'-6516"GYP. BD.5'-6"4'-3"9"9'-6"9"FSD14'-0"8'-0"CHASE30" RANGE W/ HOODVENT1'-0"5/0x5/0 SL2-2x1018" FLR.TRUSS 24" O.C. GIRDERGIRDER 2-11 7/8" LSL FLUSH2-11 7/8" LSL FLUSH 24" CANT.TRUSSES 24" O.C. GIRDER F.T.2-2x103-2x1018" FLR.TRUSS 24" O.C.6'-0"2-9 1/2" LSL FLUSH2-9 1/2" LSL FLUSH2-7 1/4" LSL2-7 1/4" LSL2-11 7/8" LSL2-2x12RADONVENT*2x6 WALLSGIRDER22'-8"TRUSSES24" O.C.21,387 # 5 1/2"x7 1.8EPARALLAM COL.SYP2400 TOP PLT.4'-9"3-2x107/6x5/0 SL2-9 1/2" LSL5'-0"TRUSSES24" O.C.FLUSH 2'-8"GASF.P.2x61'-0"2'-6"2'-6"12x12 BOXED CEDARCOL. ON 16x16x42STONE BASEREF'GRECESS1'-212"4'-2"18" FLR.TRUSS 24" O.C.2-9 1/2" LSLMICROCAB.SLSLBUILT-INSBUILT-INS 1'-8"2'-0"54" BENCH*4x4 POSTS SCREEN PORCH 3068SCREENDOORDN2-11 7/8" LSL 2-11 7/8" LSL TRUSSES24" O.C.1'-0"4'-0"BWPsAboveVerify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.777PFHPFHPFHHold-down33118.53.52.53.53.5 Planco MN, Inc.C#21-045SMA472021 SECOND FLOOR PLAN 1/4" = 1'-0" 1,254 SQ. FT.DN17 R5'-0" TUB & SHOWER 1 PIECE FIB.2'-6"66"2'-4"2'-6"2'-6"5'-0"2'-8"5'-0"2'-4" C.O.2'-4"2'-4"39"2-2x107/6x5/0 SL*CARPET MASTER BEDROOM *CARPET BEDROOM #2 BEDROOM #3 *CARPET BEDROOM #4 *CARPET W.I.C. *CARPET*VINYL*VINYL5/0x6/0 FIXED 2-2x10 40" OFF LANDING TEMP 39'-0"15'-0"15'-0"9'-0"12'-10"2'-2"7'-6"7'-6"43'-0" 1'-0"38'-0"4'-0" 11'-0"2'-8"7'-4"5'-8"11'-4"WALLEDGEWALLEDGE8'-138"9'-5 5 16"3'-6"18'-0" 13'-0"5'-0"39'-0"26'-0"13'-0"12'-0"14'-0"6'-0"6'-0"7'-0"7'-0"12'-0" 6'-4"5'-8"4'-6"5'-10"5'-11"3'-8"3'-8"8'-6"4'-6"15'-6"FFF3-2x106/0x4/6 SL6/0x4/6 SL2-2x106'-7"6'-3"6/0x4/6 SL2-2x10SD/COSDSDSDSDACCESS ATTIC 2'-6"1/2 WALLW/ WD. CAP2'-0"2'-0"9'-5"3'-9"5'-4"PKT.*C.T.*C.T.GIRDERTRUSSES 24" O.C. TRUSSES 24" O.C. TRUSSES 24" O.C.TRUSSES24" O.C.GIRDERTRUSSES24" O.C.6'-5"2x62x6RADONVENT46682'-4" 4'-0"1'-8" 2-2x10 2/0x2/0 FX LIN.2'-0"*C.T.5'-0"11'-2"2'-10"2'-0"7'-9"GIRDERGIRDER 3'-0"3'-9"4'-2 5 16"TRUSSES24" O.C.3'-8"3'-8"24"LOW LIN.WD11'-35 16"1/2 WALLW/ WD. CAP7'-1"2'-4"PKT.7'-9" 2'-0"2'-0"*BOX VAULT6'-8"39"WALLHUNG LTVerify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.Temper-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).22232223322333 Planco MN, Inc.C#21-045SMA572021 CROSS SECTION 3/8" = 1'-0" 17 RISERS 9'-11 8"3/4" T & G FLOORCURBTREATED 4x415 RISERS  “CURB2X6- 16" O.C.TREATED 4x63 1/2" CONC. FLOOR2X4- 16" O.C.CURB2X6- 16" O.C.TREATED 4x68'-11 8"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.2x6R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.11'-8"2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOOR2x42x6VBR-21 INSUL.W/ V.B.5/8" GYP. BD.VB2'-0"1'-0"R-20 SPRAY FOAM18" FLOOR TRUSSES @ 24" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDDRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAMENERGY HEELENERGY HEEL6'-6"(DESIGNED BY MFR)TRUSSES @ 24" O.C.DECKING2x8 JTS. @ 16" O.C.6x6 POST35'-0"3'-0"GIRDERR-20 SPRAY FOAM2-7 1/4" LSL1261'-4"6'-0"5916"50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTIC1/2" SHTG.15# FELTSHINGLES1'-9"712R-30 INSUL.MIN.PROOFINGWATERR-10 W/ <2.6 ACHINSUL.24x24 PADFOOTING12x16 PIERFOOTING3-2x8GRADEVENTEDSOFFITFASCIAALUM. ALUM.TRT. 6x6 POSTSIDINGSHEATHING7/16" OSBHOUSE WRAP10x10 BOXEDCEDAR COL.4" BOXEDCEDAR BEAMFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS11 7/8" LSL @ 19.2" O.C. FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS6'-8" MIN. HDRM1x8 RISERS5/4x11 TREADS4- 2x12 STRINGERSTAIR NOTES:10" ROUGH CUT TREADS11 7/8" LSL @ 19.2" O.C. 73 8"POURED WALLGRADE2" FOAM758"2" FOAM W/“%(9(/512"4'-0"R-21 INSUL.VB2x6- 16" O.C.71 2"R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.PER CODEWALL W/ REBAR9'-0" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE R-20 SPRAY FOAMGRADEFASCIAALUM. SOFFITVENTEDALUM.ENERGY HEEL1/2" SHTG.15# FELTSHINGLES1'-6"812R-49 INSUL.5'-0"11 7/8" LSL @ 19.2" O.C. R TRUSSES @ 24" O.C.CTION 3/8" = 1'-0" MUD ROOM 2-9 1/2" LSLSIDINGSHEATHING7/16" OSBHOUSE WRAPFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS Planco MN, Inc.C#21-045SMA672021 CROSS SECTION 3/8" = 1'-0" 9'-11 8"3/4" T & G FLOORCURBTREATED 4x6 “11 7/8" LSL @ 19.2" O.C. 3 1/2" CONC. FLOOR2X6- 16" O.C.8'-11 8"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOORVBR-21 INSUL.W/ V.B.5/8" GYP. BD.VB4'-0"1'-0"R-20 SPRAY FOAM18" FLOOR TRUSSES @ 24" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAMENERGY HEELENERGY HEEL(DESIGNED BY MFR)TRUSSES @ 24" O.C.7'-6"DECKING2x8 JTS. @ 16" O.C.24x24 PADFOOTING12x16 PIERFOOTING3-2x8GRADEVENTEDSOFFITFASCIAALUM. ALUM.2-7 1/4" LSL1261'-4"7'-0"6x6 POST35'-0"4'-0"GIRDER4'-0"GIRDERCURBTREATED 4x42X4- 16" O.C.5916"2-11 7/8" LSL2-11 7/8" LSLR-20 SPRAY FOAM50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTIC1/2" SHTG.15# FELTSHINGLES712R-30 INSUL.MIN.SIDINGSHEATHING7/16" OSBHOUSE WRAPSIDINGSHEATHING7/16" OSBHOUSE WRAP1'-0"15'-6"BOX VAULT @MASTER BDRM2'-0"2'-0"TRT. 6x6 POSTFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS2X6- 16" O.C.APPLY STONE TO12x12x42 TREATEDPLYWOOD BOXFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSPOURED WALLGRADE2" FOAM758"2" FOAM W/“%(9(/512"4'-0"R-21 INSUL.VB2x6- 16" O.C. Planco MN, Inc.C#21-045SMA7720214" CONC. FLOOR GARAGE GRADEPOURED WALL2X6- 16" O.C.SLOPE TO DOORS CROSS SECTION 1/4" = 1'-0" 9'-118"3/4" T & G FLOOR “11 7/8" LSL @ 19.2" O.C. 3 1/2" CONC. FLOOR8'-118"5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-49 INSUL.2x6- 16" O.C.1/2" GYP. BD.R-21 INSUL.1/2" GYP. BD.2x6- 16" O.C.3/4" T & G FLOORVBR-21 INSUL.W/ V.B.5/8" GYP. BD.VBR-20 SPRAY FOAMR-20 SPRAY FOAM18" FLOOR TRUSSES @ 24" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATEDPROOFINGWATERR-10 W/ <2.6 ACHINSUL.DRAIN TILE R-20 SPRAY FOAMR-20 SPRAY FOAM1/2" SHTG.15# FELTSHINGLES(DESIGNED BY MFR)TRUSSES @ 24" O.C.10'-31 4"(DESIGNED BY MFR)TRUSSES @ 24" O.C.12'-0"22'-0"4'-0"ENERGY HEEL50% ROOF 50% SOFFITROOF VENTS @ 1/300 ATTICVENTEDSOFFITALUM.ALUM. FASCIA1/2" SHTG.15# FELTSHINGLES1'-9"7128'-101116"1/2" GYP. BD.SIDINGSHEATHING7/16" OSBHOUSE WRAPSIDINGSHEATHING7/16" OSBHOUSE WRAPWATER PROOFINGPOURED WALLGRADE2X6- 16" O.C.R-21 INSUL.VB2" R-10RIGID INSUL.DRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS GARAGE 9'-11 8"3/4" T & G FLOOR CROSS SECTION 1/4" = 1'-0"  “11 7/8" LSL @ 19.2" O.C. 3 1/2" CONC. FLOORPROOFINGWATER5/8" GYP. BD.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.PER CODEWALL W/ REBAR8'-4" POUREDSILL PLATE1-2x6 TREATED4" CONC. FLOORSLOPE TO DRAIN1/2" GYP. BD.R-10 W/ <2.6 ACHINSUL.18" FLOOR TRUSSES @ 24" O.C.R-20 SPRAY FOAMGRADEPOURED WALL2X6- 16" O.C.10'-314"FASCIAALUM. SOFFITVENTEDALUM.1/2" SHTG.15# FELTSHINGLES1'-6"812(DESIGNED BY MFR)TRUSSES @ 24" O.C.71116"GIRDER6'-0"5/8" GYP. BD.R-20 SPRAY FOAM22'-8"R-30 INSUL.MIN.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.ROOF VENTS @ 1/300 ATTIC50% ROOF 50% SOFFIT24'-0"CLEAT15'-0"SIDINGSHEATHING7/16" OSBHOUSE WRAPFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSDRAIN TILE FOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECS ROOF PLAN 1/8" = 1'-0" 1'-6"1'-9"1'-0"1'-0"1'-4"1'-9"1271271278128128128128128126/12GIRDERGIRDERGIRDERGIRDER 1'-0"1'-6"8121274/12GIRDERGIRDER BOXVAULTFLOOR SYSTEMROOFTRUSSPVC T-FITTINGTO SUPPORTVENT PIPEMIN. 4" OF GASPERMEABLE MATERIAL3 1/2" CONC. SLAB4" PVC VENT PIPESUPPORTSTRAPPINGFLASHINGEXHAUST 10' FROM OPNGS.INTO CONDITIONED SPACESOF BUILDING12" MIN. ABOVE ROOFSEAL6 MIL POLYUNDER SLAB10' OF DRAIN TILEEACH WAY FROMT-FITTING(ROCK) RADON GAS VENT SYSTEM 1/4" = 1'-0" 36" MIN. HT. CLEAR SPACE24" DIA. AROUND VENTPROVIDE ELECTRICALBOX POWER SOURCER-4 MIN. INSUL. VENT PIPE@ UNCONDITIONED SPACE4" MIN. CLEARANCEFOR FUT. FANR-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-21 INSUL.1/2" GYP. BD.VB2x6- 16" O.C.R-20 SPRAY FOAMR-20 SPRAY FOAMFOUNDATION & FTG.SIZES & DETAILSPER ENGINEER SPECSPOURED WALLGRADE2" FOAM758"2" FOAM W/“%(9(/512" 4'-0"R-21 INSUL.VB2x6- 16" O.C.VENTEDSOFFITFASCIAALUM. ALUM.1'-6"ENERGY HEEL11916"812711 16"4x4 POSTTRT. 6x6 POST24"x42" CONC.TUBE FTG.TRT. 2x10 JTS. @ 16" O.C.SCREEN UNDERDECKING14'-0" SCREEN PORCH CROSS SECTION 1/4" = 1'-0" 10'BWL 12'-3"3'3' 47'40'BWL 2BWL 3BWL 4BWL 53'-6"3'-6"3'-6"2'-6"3'3'SEE DETAIL 1/PF-1SEE DETAIL 2/PF-18'-6"11'-6"7'7'7' BWL 6BWL 7BWL 8BWL 9BWL 1040'28'11'3'2'3'3'2'2'2'2'2'2'2'3'4'4'3'3'4' Voigt & Associates, Inc.C-1Structural Engineering Services 4635 Nicols Road, Suite 204Eagan, MN 55122MethodCS-WSPWind speed 115Exposure C BWL 1 2 3 4 5 6 7 8 9 10Spacing - ft 10 40 40 47 47 40 40 11 28 28Level 3 2 2 2 2 1 1 1 1 1Length req'd- ft 5 11.5 11.5 13.3 13.3 6 6 2.2 4.3 4.3per Table R602.10.3(1)Adjustments:Exposure 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4Eave to ridge Height 1.02 1.11 1.11 1.11 1.11 1.22 1.22 1.22 1.22 1.22Wall Height 0.9 0.95 0.95 0.95 0.95 0.9 0.9 0.9 0.9 0.9# of BWL 1 1 1 1 1 1 1 1.3 1.3 1.34" Gyp WB w.block joints1 0.7 1 1 1 1 1 1 1 1Adjusted Length 6.4 11.9 17.0 19.6 19.6 9.2 9.2 4.4 8.6 8.6Berres Ridge Model #820181 Harvest Drive, Lakeville, MNSheet Stone Cottage HVAC Load Calculations for Stone Cottage 20181 Harvest Dr Lakeville,mn Prepared By: Randy Andrews Lofgren Heating 5708 Upper 147th Street West Apple Vallley, MN 55124 Tuesday, April 27, 2021 Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 2 Project Report General Project Information Project Title:Stone Cottage Project Date:Tuesday, April 27, 2021 Client Name:Stone Cottage Client Address:20181 Harvest Dr Client City:Lakeville,mn Company Name:Lofgren Heating Company Representative:Randy Andrews Company Address:5708 Upper 147th Street West Company City:Apple Vallley, MN 55124 Company E-Mail Address:rrandrews@lofgrenheating-ac.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces North Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Elevation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Elevation Heating Adj. Factor:1.000 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29 Check Figures Total Building Supply CFM:1,069 CFM Per Square ft.:0.301 Square ft. of Room Area:3,552 Square ft. Per Ton:1,429 Volume (ft³) of Cond. Space:31,968 Building Loads Total Heating Required Including Ventilation Air:53,042 Btuh 53.042 MBH Total Sensible Gain:23,164 Btuh 78 % Total Latent Gain:6,670 Btuh 22 % Total Cooling Required Including Ventilation Air:29,834 Btuh 2.49 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 3 Miscellaneous Report System 1 Whole House Input Data Outdoor Dry Bulb Outdoor Wet Bulb Outdoor Rel.Hum Indoor Rel.Hum Indoor Dry Bulb Grains Difference Winter:-15 -15.33 80%n/a 72 n/a Summer:88 72 47%50%75 29.27 Duct Sizing Inputs Main Trunk Runouts Calculate:Yes Yes Use Schedule:No No Roughness Factor:0.00300 0.01000 Pressure Drop:0.1000 in.wg./100 ft.0.1000 in.wg./100 ft. Minimum Velocity:650 ft./min 450 ft./min Maximum Velocity:900 ft./min 750 ft./min Minimum Height:8 in.6 in. Maximum Height:10 in.6 in. Outside Air Data Winter Summer Infiltration Specified:0.250 AC/hr 0.130 AC/hr 101 CFM 53 CFM Infiltration Actual:0.250 AC/hr 0.130 AC/hr Above Grade Volume:Cu.ft.Cu.ft.X 24,335 X 24,335 6,084 Cu.ft./hr 3,164 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration:101 CFM 53 CFM Total Building Ventilation:140 CFM 70 CFM ---System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 19.31 = (0.68 X 0.970 X 29.27 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified:0.250 AC/hr (101 CFM), Construction: Unknown Summer Infiltration Specified:0.130 AC/hr (53 CFM), Construction: Unknown C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 4 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.49 1,429 3,552 23,164 6,670 29,834 53,042 1,010 1,069 1,069 System 1 No 2.49 1,429 3,552 23,164 6,670 29,834 53,042 1,010 1,069 1,069 20x10 Ventilation 340 1,352 1,692 4,550 Zone 1 3,552 22,824 5,318 28,142 48,492 1,010 1,069 1,069 20x10 1-Main Level 1,149 9,235 1,855 11,090 17,868 372 433 433 5--6 2-Upper Level 1,254 10,277 2,444 12,721 18,317 381 481 481 6--6 3-Lower Level 1,149 3,312 1,019 4,331 12,307 256 155 155 2--6 C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 5 Duct Size Preview Room or Duct Name Minimum Velocity Maximum Velocity Rough. Factor Design L/100 Actual L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main Level 450 750 0 0.1 0.1 440.7 372 433 433 5--6 2-Upper Level 450 750 0 0.1 0.1 408.7 381 481 481 6--6 3-Lower Level 450 750 0 0.1 0.1 395.2 256 155 155 2--6 Other Ducts Supply Main Trunk 650 900 0 0.1 0.1 769.9 1,010 1,069 1,069 20x10 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:1010 Cooling Flow:1069 C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 6 System 1 - Whole House - Adequate Exposure Diversity Test Test For Adequate Exposure Diversity Average Glass Sensible Gain Over 12 Hours 1.3 x Average Glass Gain Hourly Glass Gain Hourly Total Net GainHeat Gain, Btuh30.8% Diff. from Avg. (91 Btuh Excursion) 0 10,000 20,000 30,000 40,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm AED Calculation Summary --- SYSTEM DOES NOT HAVE ADEQUATE EXPOSURE DIVERSITY. --- System is on N, E, S, W rosette. Peak load exceeds 12-hour average load by 30.8%. AED Excursion (amount by which peak exceeds 1.3 x average): 91 Btuh Definition: A system has adequate exposure diversity if the peak-hour glass load for the entire conditioned space does not exceed the average glass load for the entire conditioned space by more than 30 percent. (System Concept Warning for excursion greater than 1.3 x baseline and less than 1.5 x baseline) This application has glass areas that produced relatively large heat gains for part of the day. Variable air volume devices may be required to overcome spikes in solar gain for one or more rooms. A zoned system may be required, or some rooms may require zone control (provided by individual, motorized, thermostatically controlled dampers). C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 7 System 1 - Whole House - Psychrometric Chart ZC Zone (Room) Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise DTF Draw Through Fan Sensible Gain HRV Heat Recovery Ventilator C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 8 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 403 11,219 0 8,674 8,674 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2918 16,501 0 2,524 2,524 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1116 4,758 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1254 2,182 0 1,204 1,204 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1149 2,499 0 0 0 Subtotals for structure:39,077 0 12,931 12,931 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 101, Summer CFM: 53 9,415 1,018 732 1,750 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 AED Excursion:0 0 91 91 Total Building Load Totals:53,042 6,670 23,164 29,834 Check Figures Total Building Supply CFM:1,069 CFM Per Square ft.:0.301 Square ft. of Room Area:3,552 Square ft. Per Ton:1,429 Volume (ft³) of Cond. Space:31,968 Building Loads Total Heating Required Including Ventilation Air:53,042 Btuh 53.042 MBH Total Sensible Gain:23,164 Btuh 78 % Total Latent Gain:6,670 Btuh 22 % Total Cooling Required Including Ventilation Air:29,834 Btuh 2.49 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 9 Building Pie Chart Building Loss 53,042 Btuh Floor 5%Roof 4% Wall 40% Glass 21% Door 4% Infiltration 18% Ventilation 9% Building Gain 29,834 Btuh Roof 4% Wall 8% Glass 29% Door 2% People 13% Equipment 32% Infiltration 6% Ventilation 6%AED Excursion 0% C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 10 Building Bar Graph Building Loss 53,042 Btuh 0 5,000 10,000 15,000 20,000 25,000 Floor 5%Wall 40%Door 4%Ventilation 9% Roof 4%Glass 21%Infiltration 18% Building Gain 29,834 Btuh 0 2,000 4,000 6,000 8,000 10,000 Roof 4%Glass 29%People 13%Infiltration 6%AED Excursion 0% Wall 8%Door 2%Equipment 32%Ventilation 6% C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 11 System 1 Whole House Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 403 11,219 0 8,674 8,674 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2918 16,501 0 2,524 2,524 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1116 4,758 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1254 2,182 0 1,204 1,204 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1149 2,499 0 0 0 Subtotals for structure:39,077 0 12,931 12,931 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 101, Summer CFM: 53 9,415 1,018 732 1,750 Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692 AED Excursion:0 0 91 91 System 1 Whole House Load Totals:53,042 6,670 23,164 29,834 Check Figures Supply CFM:1,069 CFM Per Square ft.:0.301 Square ft. of Room Area:3,552 Square ft. Per Ton:1,429 Volume (ft³) of Cond. Space:31,968 System Loads Total Heating Required Including Ventilation Air:53,042 Btuh 53.042 MBH Total Sensible Gain:23,164 Btuh 78 % Total Latent Gain:6,670 Btuh 22 % Total Cooling Required Including Ventilation Air:29,834 Btuh 2.49 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 12 System 1 Whole House Pie Chart System 1 Whole House Loss 53,042 Btuh Floor 5%Roof 4% Wall 40% Glass 21% Door 4% Infiltration 18% Ventilation 9% System 1 Whole House Gain 29,834 Btuh Roof 4% Wall 8% Glass 29% Door 2% People 13% Equipment 32% Infiltration 6% Ventilation 6%AED Excursion 0% C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 13 System 1 Whole House Bar Graph System 1 Whole House Loss 53,042 Btuh 0 5,000 10,000 15,000 20,000 25,000 Floor 5%Wall 40%Door 4%Ventilation 9% Roof 4%Glass 21%Infiltration 18% System 1 Whole House Gain 29,834 Btuh 0 2,000 4,000 6,000 8,000 10,000 Roof 4%Glass 29%People 13%Infiltration 6%AED Excursion 0% Wall 8%Door 2%Equipment 32%Ventilation 6% C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 14 System 1, Zone 1 Summary Loads (Average Load Procedure for Rooms) Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain 4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less), operable window, e=0.20 on surface 2, wood with metal clad frame, u-value 0.32, SHGC 0.33 403 11,219 0 8,674 8,674 11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs 2918 16,501 0 2,524 2,524 15B0-10sf-10: Wall-Basement, , R-10 board insulation to floor, no interior finish, 10' floor depth 1116 4,758 0 0 0 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation 1254 2,182 0 1,204 1,204 21A-24: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24' wide 1149 2,499 0 0 0 Subtotals for structure:39,077 0 12,931 12,931 People:9 1,800 2,070 3,870 Equipment:2,500 7,000 9,500 Lighting:0 0 0 Ductwork:0 0 0 0 Infiltration: Winter CFM: 101, Summer CFM: 53 9,415 1,018 732 1,750 System 1, Zone 1 Load Totals:48,492 5,318 22,824 28,142 Check Figures Supply CFM:1,069 CFM Per Square ft.:0.301 Square ft. of Room Area:3,552 Square ft. Per Ton:1,515 Volume (ft³) of Cond. Space:31,968 Zone Loads Total Heating Required:48,492 Btuh 48.492 MBH Total Sensible Gain:22,824 Btuh 81 % Total Latent Gain:5,318 Btuh 19 % Total Cooling Required:28,142 Btuh 2.35 Tons (Based On Sensible + Latent) Notes Calculations are based on 8th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads. C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 15 System 1, Zone 1 Pie Chart System 1, Zone 1 Loss 48,492 Btuh Floor 5%Roof 4% Wall 44% Glass 23% Door 4% Infiltration 19% System 1, Zone 1 Gain 28,142 Btuh Roof 4% Wall 9% Glass 31% Door 2%People 14% Equipment 34% Infiltration 6%AED Excursion 0% C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 16 System 1, Zone 1 Bar Graph System 1, Zone 1 Loss 48,492 Btuh 0 5,000 10,000 15,000 20,000 25,000 Floor 5%Wall 44%Door 4% Roof 4%Glass 23%Infiltration 19% System 1, Zone 1 Gain 28,142 Btuh 0 2,000 4,000 6,000 8,000 10,000 Roof 4%Glass 31%People 14%Infiltration 6% Wall 9%Door 2%Equipment 34%AED Excursion 0% C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 17 Detailed Room Loads - Room 1 - Main Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,149.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,149.0 sq.ft.Supply Air:433 CFM Ceiling Height:9.0 ft.Supply Air Changes:2.5 AC/hr Volume:10,341.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:5 Actual Winter Vent.:52 CFM Runout Air:87 CFM Percent of Supply.:12 % Runout Duct Size:6 in.Actual Summer Vent.:28 CFM Runout Air Velocity:441 ft./min.Percent of Supply:7 % Runout Air Velocity:441 ft./min.Actual Winter Infil.:45 CFM Actual Loss:0.121 in.wg./100 ft.Actual Summer Infil.:24 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 40 X 9 312 0.065 5.7 1,764 0.9 0 270 W -Wall-12F-0sw 40 X 9 350 0.065 5.7 1,979 0.9 0 303 N -Wall-12F-0sw 44 X 9 308 0.065 5.7 1,742 0.9 0 266 S -Wall-12F-0sw 44 X 9 319 0.065 5.7 1,804 0.9 0 276 N -Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353 N -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176 E -Gls-4A-1a-o shgc-0.33 0%S 48 0.320 27.8 1,336 35.0 0 1,680 W -Gls-4A-1a-o shgc-0.33 0%S 10 0.320 27.8 278 35.0 0 350 N -Gls-4A-1a-o shgc-0.33 100%S 25 0.320 27.8 696 10.4 0 260 S -Gls-4A-1a-o shgc-0.33 0%S 77 0.320 27.8 2,144 19.2 0 1,477 Subtotals for Structure:13,661 0 5,411 Infil.: Win.: 45.3, Sum.: 23.6 1,512 2.782 4,207 0.216 455 327 AED Excursion:37 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:1,000 3,000 Room Totals:17,868 1,855 9,235 C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 18 Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,254.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,254.0 sq.ft.Supply Air:481 CFM Ceiling Height:9.0 ft.Supply Air Changes:2.6 AC/hr Volume:11,286.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:6 Actual Winter Vent.:53 CFM Runout Air:80 CFM Percent of Supply.:11 % Runout Duct Size:6 in.Actual Summer Vent.:32 CFM Runout Air Velocity:409 ft./min.Percent of Supply:7 % Runout Air Velocity:409 ft./min.Actual Winter Infil.:44 CFM Actual Loss:0.105 in.wg./100 ft.Actual Summer Infil.:23 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-12F-0sw 43 X 9 371 0.065 5.7 2,098 0.9 0 321 W -Wall-12F-0sw 43 X 9 357 0.065 5.7 2,019 0.9 0 309 N -Wall-12F-0sw 39 X 9 296 0.065 5.7 1,674 0.9 0 256 S -Wall-12F-0sw 39 X 9 286 0.065 5.7 1,617 0.9 0 247 E -Gls-4A-1a-o shgc-0.33 0%S 16 0.320 27.8 445 35.0 0 560 W -Gls-4A-1a-o shgc-0.33 0%S 30 0.320 27.8 835 35.0 0 1,050 N -Gls-4A-1a-o shgc-0.33 100%S 55 0.320 27.8 1,531 10.4 0 573 S -Gls-4A-1a-o shgc-0.33 0%S 65 0.320 27.8 1,810 19.2 0 1,247 UP-Ceil-16B-50 1254 X 1 1254 0.020 1.7 2,182 1.0 0 1,204 Subtotals for Structure:14,211 0 5,767 Infil.: Win.: 44.2, Sum.: 23.0 1,476 2.782 4,106 0.216 444 319 AED Excursion:41 People: 200 lat/per, 230 sen/per:5 1,000 1,150 Equipment:1,000 3,000 Room Totals:18,317 2,444 10,277 C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 19 Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure) General Calculation Mode:Htg. & clg.Occurrences:1 Room Length:1,149.0 ft.System Number:1 Room Width:1.0 ft.Zone Number:1 Area:1,149.0 sq.ft.Supply Air:155 CFM Ceiling Height:9.0 ft.Supply Air Changes:0.9 AC/hr Volume:10,341.0 cu.ft.Req. Vent. Clg:0 CFM Number of Registers:2 Actual Winter Vent.:36 CFM Runout Air:78 CFM Percent of Supply.:23 % Runout Duct Size:6 in.Actual Summer Vent.:10 CFM Runout Air Velocity:395 ft./min.Percent of Supply:7 % Runout Air Velocity:395 ft./min.Actual Winter Infil.:12 CFM Actual Loss:0.098 in.wg./100 ft.Actual Summer Infil.:6 CFM Item Description Area Quantity -U- Value Htg HTM Sen Loss Clg HTM Lat Gain Sen Gain E -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0 W -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0 N -Wall-15B0-10sf-10 44 X 9 396 0.049 4.3 1,688 0.0 0 0 S -Wall-12F-0sw 44 X 9 319 0.065 5.7 1,804 0.9 0 276 S -Gls-4A-1a-o shgc-0.33 0%S 77 0.320 27.8 2,144 19.2 0 1,477 Floor-21A-24 1 X 1149 1149 0.025 2.2 2,499 0.0 0 0 Subtotals for Structure:11,205 0 1,753 Infil.: Win.: 11.9, Sum.: 6.2 396 2.783 1,102 0.217 119 86 AED Excursion:13 People: 200 lat/per, 230 sen/per:2 400 460 Equipment:500 1,000 Room Totals:12,307 1,019 3,312 C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 20 Room Cooling and Heating Loads Bar Graphs Cooling Heating Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 20,000 C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 21 Room Cooling Loads Bar Graphs Sensible Latent Btuh Lower Level Upper Level Main Level 0 5,000 10,000 15,000 C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Lofgren Htg. & A/C Stone Cottage Farmington, MN 55024 Page 22 System 1 Room Load Summary No Room Name Area SF Htg Sens Btuh Min Htg CFM Run Duct Size Run Duct Vel Clg Sens Btuh Clg Lat Btuh Min Clg CFM Act Sys CFM ---Zone 1--- 1 Main Level 1,149 17,868 372 5-6 441 9,235 1,855 433 433 2 Upper Level 1,254 18,317 381 6-6 409 10,277 2,444 481 481 3 Lower Level 1,149 12,307 256 2-6 395 3,312 1,019 155 155 Ventilation 4,550 340 1,352 System 1 total 3,552 53,042 1,010 23,164 6,670 1,069 1,069 System 1 Main Trunk Size:20x10 in. Velocity:770 ft./min Loss per 100 ft.:0.089 in.wg Cooling System Summary Cooling Tons Sensible/Latent Split Sensible Btuh Latent Btuh Total Btuh Net Required:2.49 78% / 22%23,164 6,670 29,834 Actual:1.00 77% / 23%9,240 2,760 12,000 Equipment Data Heating System Cooling System Type:Natural Gas Furnace Standard Air Conditioner Model:QC-F38-E78-G QC-C12 Indoor Model:S12 Brand:Quikcool FE Series Quikcool AS Series Description:Hi Efficiency Furnace Standard Efficiency Air Condit Efficiency:78.3 AFUE 12.4 SEER Sound:8.1 bels Capacity:38,000 Btuh 12,000 Btuh Sensible Capacity:n/a 9,240 Btuh Latent Capacity:n/a 2,760 Btuh C:\ ...\20181 HARVEST LAKEVILLE 04272021.rhv Tuesday, April 27, 2021, 1:14 PM Builders Associaton of Minnesota version 101014 Date Certificate Posted x Passive (No Fan) Active (With fan and monometer or other system monitoring Location (or future location) of Fan: Other Please Describe Here x 10/15 x x x 20 x 20 x 21 x 49 x x x x x Not applicable, all ducts located in conditioned space x Not required per mech. code Passive Powered Interlocked with exhaust device. Describe:Input in BTUS: 70,000 Capacity in Gallons: Other, describe: AFUE or HSPF% 93% Cfm's " round duct OR " metal duct Not required per mech. code x Passive Low: Other, describe: x Low: Location of fan(s), describe: Cfm's 4" " round duct OR Flex " metal duct ML193UH070 Heating Loss Manufacturer Lennox Natural Gas Output in Tons: 3 Ton50 Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Capacity continuous ventilation rate in cfms: 200CFM Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): 23,164Residential Load Calculation SEER /EER Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Electric Make-up Air Select a Type AO Smith Domestic Water Heater MECHANICAL SYSTEMS Rating or Size Efficiency 13 Seer Building envelope air tightness: Rim Joist (1st Floor) GPVL-50 13ACXN042-230 Model Heating System Natrual Gas Lennox Fiberglass, Batts Foundation Wall R-value Average U-Factor (excludes skylights and one door) U: Duct system air tightness: Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply Mineral Fiberboard Insulation Location Foam, Closed Cell0.22 Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Non or Not ApplicableAttic Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area Rim Joist (2nd Floor+) 0.30 Appliances Mech Room Heat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: 53,042 Heating Gain Cooling Load Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Place your logo here New Construction Energy Code Compliance Certificate Name of Residential Contractor Stone Cottage Construction Inc. MN License Number Lakeville20181 Harvest Dr BC636874 City Mailing Address of the Dwelling or Dwelling Unit Combustion Air Select a Type Location of duct or system: 29,834 Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION This form must be completed and submitted with all new residential permit applications. New residential building permits WILL NOT be issued without this completed form. Project Site Address: _____________________________________________________________________ Company Name: _________________________________________________________________________ Primary Contact: _________________________________________________________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Description of Land Disturbing Activity: _____________________________________________________ NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___ If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an erosion and sediment control plan MUST be submitted with the residential building permit application. “The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater Permit.” (NPDES Construction Stormwater Permit, MPCA) “The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.” (NPDES Construction Stormwater Permit, MPCA) Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control inspections and corrective actions: Name of Person: ________________________________Company: _______________________________ Phone # (24 hr Contact): ______________________ Email: ______________________________________ Entity that Provided Training: ________________________ Certification Expiration Date: ____________ NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots. No land disturbing activity may begin until a residential building permit has been issued. I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER; withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater Permit (MN R 100001) or erosion and sediment control plan. Signature: ________________________________________________ Date:_________________________ Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500 X KP 05/19/21