Loading...
HomeMy WebLinkAboutLA198717 -Approved Ian Payne Solar Drawings wStamp 12 17 2021EXISTINGSNAPNRACKSITE MAP & PV LAYOUTELECTRICAL 1-LINE DIAGRAM ATTACHMENT LAYOUTSYSTEM LABELING DETAILINVERTER DATA SHEETSHEET INDEXPROPERTY PLANMODULE DATA SHEETRACKING DATA SHEETATTACHMENT DATA SHEETPV 1.0PV 2.0PV 4.0PV 5.1PV 6.0D 8.0D 9.0D 10.0SYSTEM RATINGEQUIPMENT SUMMARYELECTRICAL INFORMATIONMAIN SERVICE PANEL BUS SIZE:MAIN SERVICE BREAKER SIZE:MOUNTING SYSTEM:BUILDING INFORMATIONCONSTRUCTION TYPE: V-BOCCUPANCY: R3ROOF:Truss 2 x 4 @ 24" O.C.Comp ShingleVICINITY MAP (SCALE: NTS)SATELLITE VIEW (SCALE: NTS)GENERAL NOTES1.All electrical materials shall be new and listed by recognizedelectrical testing laboratory Custom made equipment shall have complete test data submittedby the manufacturer attesting to its safety2.Outdoor equipment shall be NEMA 3R rated or equivalent3.All metallic equipment shall be grounded4.Contractor shall obtain electrical permits prior to installation andshall coordinate all inspections, testing commissioning andacceptance with the client, utility co. and city inspectors as needed.5.The electrical contractor shall verify the exact locations of servicepoints and service sizes with the serving utility company andcomply with all utility companies requirements.6.Drawings are diagrammatic only, routing of raceways shall beoption of the contractor unless otherwise noted and shall becoordinated with other trades.7.If the roof material or the roof structure not adequate for PVinstallation, call the engineer of record print to installation. Thecontractor is responsible to verify that the roof is capable ofwithstanding the extra weight.8.If the distances for cable runs are different than shown, thecontractor shall notify the electrical engineer to validate the wiresize. Final drawings will be red-lined and updated as appropriate.9.Whenever a discrepancy in quality of equipment arises on thedrawing or specifications, the contractor shall be responsible forproviding and installing all materials and services required by thestrictest conditions noted on the drawings or in the specificationsto ensure complete compliance and longevity of the operablesystem required by the engineer of record.PHOTOVOLTAIC NOTES:1.Rooftop mounted photovoltaic panels and modules shall be tested,listed and identified by recognized testing laboratory2.Solar system shall not cover any plumbing or mechanical vents3.Modules and support structures shall be grounded unless racking has integrated ground.4.Removal of an interactive inverter or other equipment shall notdisconnect the bonding connection between the groundingelectrode conductor and the photovoltaic source and/or outputcircuit grounded conductors.5.All PV modules and associated equipment and wiring shall beprotected from physical damage.6.Live parts of PV source circuits and PV output circuits over 150v toground shall not be accessible to other than qualified persons while energized.7.Inverter is equipped with integrated DC disconnect, thus providingground fault protection8.All conductors shall be copper and 75 deg rated9.A single conductor shall be permitted to be used to perform themultiple functions of dc grounding, AC grounding and bondingbetween AC and DC systems.10.Non-current carrying metal parts of equipment shall be effectivelybonded together. Bond both ends of raceways.200A200A12/17/2021Property Address:Owner:Ian PayneProperty Type:Single Family ResidenceDrawn by:New@engineerinc.ioDate:DC 7.22 KW STCAC 6.00 KW STC19759 Henning Ave Lakeville, MN 55044CONTRACTORAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comTHE INSTALLATION OF SOLAR ARRAYS ANDPHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITHTHE FOLLOWING CODES:·2020 National Electrical Code·2018 International Building Code·2018 International Residential Code·2020 Minnesota Residential Code·2020 Minnesota Building Code·2020 Minnesota Energy Code·2020 Minnesota Accessibility Code·2020 Minnesota State Fire Code·2018 International Fire Code·2018 International Energy Conservation Code·2018 Mechanical CodeAS ADOPTED BY THE STATE OF MINNESOTAALL OTHER ORDINANCE ADOPTED BY THELOCAL GOVERNING AGENCIESGOVERNING CODESPV 3.1Xcel Energy Application#:TBD19 SILFAB 380 WATT MODULES WITH P400 POWEROPTIMIZERS, SOLAREDGE 6.0 KW INVERTEROPTIMIZER DATA SHEETPV 7.0D 11.0SURGE PROTECTIOND 12.0 ATTACHMENT DETAILPV 5.2D 13.0INVERTER CERTIFICATIOND 15.0PV INSPECTION CHECKLISTINVERTER CERTIFICATIONPLACARDPV 3.2D 14.0WITNESS TESTDate Certified andSigned: 12/17/2021 SOLAR MODULES___SILFAB 380 WattModel #SIL-380BKEMT type ConduitSolar Module(N) Junction BoxJB.........................................................19MSP(E) Main Service Panel200AINDEXAC...................(N) 60A Utility AC(N) OptimizerNOTE: Conduit in attic shallbe minimum 18 inches from roof sheating* Roof access is not located in areas that require placement of ground ladders over exterior wall openings (R324.6.1).SITE MAP & PVLAYOUTPV 1.0PV SYSTEMAS INDICATEDScale:Project:Drawn by:New@engineerinc.ioProject Name:Property Adress:12/17/2021Ian Payne19759 Henning AveLakeville, MN 55044DATE:CONTRACTORIN(N) Inverter.........................Wolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comNOTE: No clearance issue Distance between all equipments is maximum 10"(E) Main MeterMM........................FMT type Conduit..............SECONDARY INTERCONNECTIONEQUIPMENT ELEVATIONMainServicePanelUtility ACDisconnect4'MainMeterOutsideOutsideInsideInsideXcel Energy Application#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENT..........................SolarEdgeStorEdgeNOTE:A 36-inchwide pathwayshall be provided to the emergencyescape and rescue opening.From roofINVERTERINVERTER TYPE: Central:Solar Edge Single Phase6.0 kW InverterModel #SE6000H-US(240V)<10'Xcel Energy Application#:TBDFire Setback.......................aaaaaaaabbbbbbbbbbHenning AveSolar PV Array19- Silfab 380W Modules19- P400Power OptimizerPitch: 36 DegOrientation:180 DegJBMMMSPINACUTILITY AC DISCONNECT LOCKABLEAND READLY ACCESSIBLE3' fire setbacka3' fire setback3' fire Pathway3' fire Pathway''Roof Access''''Roof Access''3' fire PathwaySCALE:3/32" = 1'-0" 180° 90° 270°0°SWNE 6000(4) #10 AWG THWN/THWN-2(1) #8 AWG GND3/4" FMT, 15 FEET1J BOXNEMA3RSolarEdge Power OptimizerRated DC Input Power -Maximum Input Voltage 80 VdcMPPT Range - 8to 80 VdcMaximum Input Current - 12.5 AdcMaximum Output Current - 15 AdcString Limitations - 8 to 25Optimizers, watts STC per string maximum.Solaredge optimizers have integratedrapid shut downP400400watts9STRING - A2 PV 2.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044ELECTRICAL 1-LINE DIAGRAMCONTRACTOR60A NON-FUSED AC DISCONNECT,UTILITY AC DISCONNECTVISIBLE-OPENLOCKABLE, READILY ACCESSIBLENEMA3R120 / 240V25AWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comEXISTING______ MAINSERVICEPANEL120/240V,1P, 3WGEC(E) GROUNDINGELECTRODE SYSTEM200ANOTE: Service Panel does not contain center fed Main Breaker:SECONDARY INTERCONNECTIONATT:PLEASE REFER TO WH NETMEETERING GUIDE:APPENDIX GThe lockable visible disconnect must be located within 5 feet from the GeneralService Meter and must be located onthe exterior of the buildingMeter Socket must be 200A ratedand must have lever BypassFor smaller DERs, using the PoC as the Reference Point of Applicability allows the DERequipment type testing certification to be utilized as the main method by whichcompliancewith the Standard is verified. The PoC might be the terminals of an inverter, for example,and utilizing a UL 1741 certified and listed inverter would be sufficient to demonstrateStandard compliance. In locations where there is no local Public Authority, the customer is exempt frominspection, and/or the service has been shut off or disconnected for more than 365 days (1 year),the licensed electrician or wireman shall submit a signed and dated Xcel Energy ElectricalInspection Certificate to the Company’s Builders Call Line attesting that the electrical installationhas been completed and installed according to the current National Electrical Code®, the Xcel EnergyStandard for Electric Installation and Use, and any other applicable codes that apply beforeelectric service is energized.AtticWall MAIN METER120/240V,1P, 3W(4) #10 AWG THWN/THWN-2(1) #8 AWG GND3/4" EMT, 5 FEET110STRING - B2NOTE:UTILITY HAS 24 HOURUNRESTRICTED ACCESS TO ALL PVSYSTEM COMPONENTS LOCATED ATSERVICE ENTRANCE.If there is cold water bonding and UFER , noadditional supplementary rod is requiredIf there is no UFER new ground rod shall beinstalledIf existing ground rod is more than 25-OHMthan a new ground rod shall be installedEXISTINGNON CENTER _____MAIN C/B200A(2) #10 AWG PV WIRE,(1) #10 AWG EGCFREE IN THE AIRSurge ProtectionREFERENCE POIN OF APPLICABILITYSILFAB 380 WATT MODULES19P400 POWER OPTIMIZER19(3) #8AWG THWN/THWN-2(1) #6 AWG GND 3/4" EMT, 2 FEETXcel Energy Application#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENTSolar Edge single phaseHD Wave 6.0kWInverter have IntegratedDC Disconnect safety switchand Arc Fault ProtectionINVERTERSOLAR EDGE 6.0 kWMODEL #SE6000H-US(240V)(3) #8AWG THWN/THWN-2(1) #6 AWG GND 3/4" EMT,2 FEET25ADrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBDDrawn by:New@engineerinc.ioDC 7.22 KW STCAC 6.00 KW STCINSTALL ____ 2P CB(PV)INSTALL AT OPPOSITEEND OF BUS FROMMAIN FEEDER CB35APV ARRAY RATINGWIRE SIZE CALCULATIONPV ARRAYFROM JUNCTION BOX TO INVERTERNumber Modules19TypeSIL-380 BKSILFAB 380 WattMaximum Current (A)10 * 380 / 400 = 9.5Number Inverters1Solar Edge 6kW Inverter with OptimizersSE6000H-US (240V)Considers Continuous (A)9.5 * 1.25 = 11.88Total DC Wattage (Watts)Watts STC, (Watts/Module) 19 * 380 = 7220Short Circuit Current (A)11.88 * 1.25 = 14.85Array CurrentsI-SC10.49AI-MP9.92ARaceway Height From Roof (Temp 39+22=61C)3 1/2"Module VoltageV-OC45.69VV-MP38.32VTemp. Derate Factor (A)14.85 / 0.71 = 20.92SYSTEM POWER#of wire(#of Strings*2)4Number Of Strings2Max Number of Modules Per String10More Than 3 CCC Adjist. Factor0.8Max DC Wattage In Strings10 * 380 = 3800 < 5700 (Watts)Max AC Voltage 120/240VAdjusted Conductor Ampacity(A)20.92 / 0.8 = 26.15FROM INVERTER TO MAIN PANELWire Size from NEC Table 310.15(b)1610 AWGTotal Current (A)25Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a)0.71Total AC Wattage (Watts)6000Consider Continuous (A)25 * 1.25 = 31.25Temperature Adjustment31.25 / 0.91 = 34.34AConductor Size From NEC Table 310.168 AWGMAIN PANELPV Backfeed Breaker Size (A)35Main Breaker (A)200Main Bus Rating (A)200Total Amps On Bus (120%)35 + 200 = 235 <= 240 (A) PV 3.1PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comSOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWNTURN RAPID SHUTDOWNSWITCH TO THE"OFF" POSITION TOSHUT DOWN PV SYSTEMAND REDUCESHOCK HAZARDIN THE ARRAYSOLAR ELECTRICPV PANELSPV ARRAYJ BOXPV SUB-PANELACDISCONNECTMAIN SERVICEPANELMETER122221516207124Note: LABELS SHALL COMPLY WITH NEC 690“Labels shall be weatherproof, durable and permanently mounted”25APhotovoltaic Power SourceLABEL 1CAUTION: SOLAR CIRCUITLABEL 2WARNINGELECTRIC SHOCK HAZARDTHE DC CONDUCTORS OF THISPHOTOVOLTAIC SYSTEM AREUNDERGROUND AND MAY BE ENERGIZEDLABEL 3WARNINGELECTRIC SHOCK HAZARDIF GROUND FAULT IS INDICATEDNORMALLY GROUNDED CONDUCTORSMAY BE UNDERGROUND AND ENERGIZEDLABEL 4WARNINGELECTRIC SHOCK HAZARDDO NOT TOUCH TERMINALSTERMINALS ON BOTH LINE AND LOADSIDES MAY BE ENERGIZED IN THE OPENPOSITIONLABEL 5WARNINGELECTRIC SHOCK HAZARDDO NOT TOUCH TERMINALSTERMINALS ON BOTH LINE AND LOADSIDES MAY BE ENERGIZED IN THE OPENPOSITIONDC VOLTAGE IS ALWAYS PRESENTWHEN SOLAR MODULESARE EXPOSED TO SUNLIGHTLABEL 6WARNINGLABEL 7TURN OF PHOTOVOLTAICAC DISCONNECT PRIOR TOWORKING INSIDE PANELDO NOT DISCONNECTUNDER LOADLABEL 8MAIN PV SYSTEMDISCONNECTLABEL 9MAIN PV SYSTEMAC DISCONNECTLABEL 10LABEL 11CAUTIONLABEL 12SOLAR ELECTRIC SYSTEMCONNECTEDWARNING-LABEL 13 DUAL POWER SOURCESECOND SOURCE IS PV SYSTEMCAUTIONLABEL 14PHOTOVOLTAIC SYSTEM CIRCUITIS BACKFEDLABEL 15PHOTOVOLTAIC AC DISCONNECTMAXIMUM AC OPERATING CURRENTMAXIMUM AC OPERATING CURRENTPHOTOVOLTAICLABEL 16UTILITY AC DISCONNECTPHOTOVOLTAICLABEL 17DC DISCONNECTNOMINAL OPERATING AC VOLTAGENOMINAL OPERATING AC FREQUANCYMAXIMUM AC POWERMAXIMUM AC CURRENTMAX OCERCURRENT DEVICE RATINGFOR AC MODULE PROTECTIONLABEL 18LABEL 19PV SYSTEM DC DISCONNECTOPERATING CURRENTOPERATING VOLTAGEMAXIMUM SYSTEM VOLTAGESHORT CIRCUIT CURRENTRATED MAX POWER-FONT CURRENTRATED MAX POWER-FONT VOLTAGEMAXIMUM SYSTEM VOLTAGESHORT CIRCUIT CURRENTMAX RATED OUTPUT CURRENT OFTHE CHARGE CONTROLLER IF INSTALLEDLABEL 20***ALL LABELS = RED THERMOPLASTIC/REFLECTIVE , Permanently mounted240VSOLAR DISCONNECT20SYSTEM LABELING DETAILDrawn by:New@engineerinc.io12/17/2021DATE: PLACARDPV 3.2PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comCAUTIONPOWER TO THIS BUILDING IS ALSO SUPPLIEDFROM THE FOLLOWING SOURCES WITHDISCONNECTS LOCATED AS SHOWN:CAUTIONPOWER TO THIS BUILDING IS ALSO SUPPLIEDFROM THE FOLLOWING SOURCES WITHDISCONNECTS LOCATED AS SHOWN:SERVICE 1 OF 2SERVICE 2 OF 219759 Henning Ave Lakeville, MN 5504419759 Henning Ave Lakeville, MN 55044Drawn by:New@engineerinc.io12/17/2021DATE:NWESNWESXcel Energy Application#:TBDSERVICE POINT &UTILITY METERINGPV SYSTEM DISCONNECTFOR UTILITY OPERATIONSOLAR INVERTERSOLAR PV ARRAYSERVICE POINT &UTILITY METERINGPV SYSTEM DISCONNECTFOR UTILITY OPERATIONSOLAR INVERTERSOLAR PV ARRAY PROPERTY PLANLEGENDMSPMain Service Panel................ AC DisconnectAC.........................PV 4.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORInverterIN........................................Wolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comMMMain Meter............................Xcel Energy Application#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENTDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBDFire Setback.......................Solar Module.....................Henning Ave96'144'-9"96'28'-2"34'-10"49'-9"78'-9"PROPERTY LINEMMMSPINACDRIVEWAY''Roof Access''''Roof Access''SCALE:1/16" = 1'-0" 180° 90° 270°0°SWNEDate Certified andSigned: 12/17/2021 ATTACHMENTLAYOUTBlockingDF#22 x 61 Layer of .Plywood & Building FeltSolar Module6"AttachmentTruss 2 x 4 @ 24" O.C.Comp ShinglePV 5.1PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDESIGN CRITERIAModules:Max Distributed Load: 3 PSFPOINT LOAD CALCULATION PER ARRAYModule Weight (lbs)# Of Modules41.9Total Module Weight (lbs)Rack Weight (lbs)Optimizers Weight (lbs)Total System Weight (lbs)# Of StandoffsMax Span Between Standoffs (in)Loading Per Standoff (lbs)Total Area (sq.ft.)Loading (PSF)796.1159.2232.3987.62464821.474182.36RAIL ATTACHMENTMODULES ON ROOFTruss 2 x 4 @ 24" O.C.1919Xcel Energy Application#:TBDNote: 24/ 7 Unescorted keyless access is to beprovided for ALL UTILITY EQUIPMENTMODULES ON ROOFPrior to the commencement of work, the contractor shall verify the existing roof and framingconditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction.Prior to the commencement of work, the contractor shall inspect framing for any damagesuch as water damage, cracked framing, etc. and These Plans are stamped for structuralcode compliance of the roof framing supporting the proposed PV installation reference only.These plans are not stamped for water leakage. PV modules, racking, and attachmentcomponents must follow manufacturer guidelines and requirements. Attachments to beinstalled in a staggered orientation to properly distribute loads.1.86"3.05"0.25"Ø2.24"2.58"1"0.17"3.20"1.37"0.38"0.30"1.08"2.78"1.78"1.50"1.99"1.21"R 1.12"Ø0.33"R 0.82"12345SNAPNRACK, SPEEDSEAL FOOT, BASE, SEALING, SILVER/BLACKBOLT, FLANGE, SERRATED, 5/16IN-18 X 2IN, SSSNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SSSNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR/BLACKSNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR/BLACK12345DESCRIPTIONITEMQTI11111MATERIALS:DESIGN LOAD (LBS):ULTIMATE LOAD (LBS):TORQUE SPECIFICATION:CERTIFICATION:WEIGHT (LBS):DIE CAST A380 ALUMINUM, 6000 SERIES ALUMINUM, STAINESS STEEL802 UP, 1333 DOWN, 357 SIDE2118 UP, 4006 DOWN, 1331 SIDE12 LB-FTUL 2703, FILE E359313; WIND-DRIVEN RAIN TEST FROM SUBJECT UL 25820.45OPTIONS:CLEAR/BLACKPARTS LISTSNAPNRACK, ULTRA RAIL SPEEDSEAL TM FOOTDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBDDate Certified andSigned: 12/17/2021 PV 5.2PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044ATTACHMENT DETAILCONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD INVERTERDATA SHEETINVERTERDATA SHEETD 6.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD POWER OPTIMIZERDATA SHEETD 7.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD MODULEDATA SHEETD 8.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD RACKINGDATA SHEETD 9.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD ATTACHMENTDATA SHEETD 10.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD D 11.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORSURGE PROTECTIONWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDATE:Drawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD D 12.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORINVERTERCERTIFICATIONWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD D13.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044CONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comINVERTERCERTIFICATIONDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD D 14.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044WITNESS TESTCONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD D 15.0PV SYSTEMAS INDICATEDScale:Project:Project Name:Property Adress:Ian Payne19759 Henning AveLakeville, MN 55044PV INSPECTIONCHECKLISTCONTRACTORWolf RIver ElectircAddress:101 Isanti ParkwayNE, Isanti, MN 55040Phone number: (763) 229-6662E-mail: contact@wolfriverelectric.comWolf RIver ElectricLakeville, MN 5504419759 Henning AveDrawn by:New@engineerinc.io12/17/2021DATE:Xcel Energy Application#:TBD